P5.
Control lines
Before attempting to assemble your Topper, carefully study
the diagram on the inside front cover of this handbook and
thoroughly familiarise yourself with all the components, their
correct names and places on the boat.
If you follow these rigging instructions, stage-by-stage you
will find Topper incredibly simple and quick to prepare for
the water. When you have unpacked everything, lay out the
various control lines on the foredeck and identify them:
A.
Main Halyard Loop
B. Kicking
Strap
C. Downhaul
D. Mainsheet
E. Bow
Painter
F. Outhaul
G. Traveller
H. Daggerboard
Shockcord
I.
Toe Strap Shockcord
A Centre Mainsheet and an Aft Rigged Mainsheet are
available. The Aft Rigged Mainsheet kit is pictured below.
The Centre Mainsheet kit is pictured on page 12.
On the following pages we have continued this coding
system on the photographs so that you can immediately
identify each control line.
A
B
F
G
H
I
D
C
E
Owners manual Topper 8/2/06 12:34 Page 5