13
Nortek Security & Control LLC
Marking and cutting the opening
1.
Choose the best location for your subwoofer, preferably centered between
vertical wall studs. Use a stud finder to find where the studs are. Do not position
the subwoofer closer than one inch from the cabinet sides to a stud. This allows
for the clamps to swing out.
2.
Tape the supplied cutout template onto the wall surface, and use a level to make
sure it is vertical.
3.
Mark the sheetrock with a pencil around the inside of the template, and remove
the template.
4. IMPORTANT:
Turn off the electricity to the room, just in case you accidentally cut
a live AC mains wire.
5.
Drill a small pilot hole, and using a flashlight and small mirror, look for any
obstructions such as water pipes, gas lines, or electrical wires that may interfere
with the subwoofer installation.
6.
If all is clear, carefully cut out the sheetrock around the marked lines, and remove
any debris from the hole.
Marking the opening onto
the wall using the inside of
the template