- 9 -
f) Check that the Run/Stop column has green indicators. If not, select the Diagnostics tab
to determine the error.
4.3 Configure the PROFINET IO Network
a) Execute SIMATIC NCM PC Manager (or STEP7 SIMATIC Manager).
Create a new project with File->New.
Select “Insert->Station->SIMATIC PC Station”.
Change the name to match the PC station name in the Station Configuration Editor (e.g.,
PCStation) as shown below.
Configuration OK