13
23. Remove the upper 3/8” x 3” Bolt (45) from the
Top Frame (1) and the Main Upright (3).
Route the High Cable (73) around a 4” Pulley
(35) and down through the indicated slot in the
Main Upright (3), as shown. Attach the Pulley
inside the slot with a 3/8” x 2 1/2” Bolt (54), two
3/8” Washers (55), two 5/8” x 1/2” Bushings (42),
and a 3/8” Nylon Jamnut (63).
Re-insert the 3/8” x 3” Bolt (45) and secure it with
a 3/8” Nylon Locknut (50). Note: The High Cable
(73) must be seated in the groove of the 4”
Pulley (35) before the Bolt is inserted.
23
Slot
35
73
55
54
42
55
3
42
63
45
50
1
25. Wrap the High Cable (73) around a 4” Pulley (35).
Attach the Pulley inside the indicated slot in the
Main Upright (3) with a 3/8” x 2 1/2” Bolt (54), two
3/8” Washers (55), two 5/8” x 1/2” Bushings (42),
and a 3/8” Nylon Jamnut (63).
Wrap the High Cable (73) around another 4” Pulley
(35) in the direction shown. Route the High Cable
through the slot in the Main Upright (3). Attach the
Pulley to the Press Frame (12) with a 3/8” x 8 1/2”
Bolt (59) and a 3/8” Nylon Locknut (50).
24
25
73
Welded Tube
50
50
35
59
73
42
42
63
55
55
54
59
3
12
35
12
Slot
35
24. Route the High Cable (73) under the welded tube
on the Press Frame (12) and around a 4” Pulley
(35) as shown. Attach the Pulley to the Press
Frame with a 3/8” x 8 1/2” Bolt (59) and a 3/8”
Nylon Locknut (50).