5
2. Orient the Front Stabilizer (15) as shown. While another
person lifts the front of the Frame (1), attach the Front
Stabilizer to the Frame with two M10 x 112mm
Carriage Bolts (76) and two M10 Nylon Locknuts (72).
15
72
1
2
3. Attach the Frame Rail (52) to the Frame (1) with two
M8 x 19mm Button Screws (40) and two M8 Split
Washers (55). Be careful to avoid damaging the Side
Shields (26, 27).
40
1
76
3
52
55
4
2
40
Make sure the
wire harnesses
do not get
pinched and
damaged during
this step.
55
40
55
55
40
1
4. While another person holds the Upright (2) in the posi-
tion shown, connect the Upper Wire Harness (42) to
the Lower Wire Harness (43). Gently pull the upper
end of the Upper Wire Harness to remove any slack
from the Wire Harnesses.
Slide the Upright (2) onto the top of the Frame (1) as
shown. Attach the Upright with three M8 x 19mm
Button Screws (40) and three M8 Split Washers (55).
Be careful to avoid pinching the Wire Harnesses
(42, 43).
42
43
27
26