11
ASSEMBLY
STEP 2
2A Greasing The Rotation Rod:
Remove the Pre-Assembled two
Bolts (5)
, two
Spring Washer
(6)
, two
D Washers (7)
, two
Wave Washer
(22)
from the
Rotation Rod (60)
. Use the
Grease
provided to lubricate a thin, even coat of grease onto the
Rotation Rod (60)
. The
Grease
will be
used in future steps. Insert the
Rotation Rod (60)
into the top of the
Main Frame (59)
.
2B Installing The Handrails:
Install the
Right Handrail (9)
onto the right end of the
Rotation Rod
(60)
with one
Wave Washer (22)
, one
D Washer (7)
, one
Spring Washer (6)
, and one
Bolt (5)
.
Repeat this step for the
Left Handrail (77)
. Be sure the
D Washers (7)
sit properly along the
Rotation Rod (60)
. Simultaneously tighten both
Bolts (5)
with the
6mm Allen Wrench
and
6mm
Allen Wrench With Phillips Screwdriver.
2C
Installing The Foot Bars:
With the bend going downwards install the
Right Foot (17)
to the
bottom end of the
Right Handrail (9)
with one
Hex Head Bolt (11)
and one
Nylon Nut (14)
.
Simultaneously tighten the
Hex Head
Bolt (11)
and
Nylon
Nut (14)
with the
Multi-Hex Tool With
Phillips Screwdriver
and
Open-Ended Flat Wrench
. Repeat this process for the
Left Foot Bar
(76)
. Cover the
Nylon Nuts (14)
and the
Hex Head Bolts (11)
with
Nut Caps (88).
PRE-INSTALLED HARDWARE
(22) Wave Washer
2PCS
(7) D Washer
2PCS
(6) Spring Washer
2PCS
(5) Bolt
2PCS
6mm Allen Wrench with
Phillips Screwdriver
TOOLS
6mm Allen Wrench
Multi-Hex Tool With
Phillips Screwdriver
Open-Ended Flat
Wrench
(11) Hex Head Bolt
2PCS
(14) Nylon Nut
2PCS
HARDWAREWARE PACK
Grease
1PC
Summary of Contents for Air Elliptical 1307
Page 5: ...3 LABEL PLACEMENT...
Page 8: ...6 OVERVIEW DRAWING...
Page 11: ...9 HARDWARE TOOLS PACK...