background image

 

5

CONNECTIONS SCHEME 

 
 

3.6. SUPLEMENTARY RELAYS 

 

The supplementary relays on the start and stop 

outlets will protect the Diesel-control from possible 
anomalies from problems arising from the high power 
which the distributor or electro-magnet needs for its 
correct working. 
 

The relays used will be 12v, with a shorting 

capacity of 20 or 30ª. These relays are the type usually 
used in the motor industry. 
 

The supplementary relays can be placed inside 

a sealed box of the type used in electrical installations, 
which will be mounted as close as possible to the 
engine. 
 

The cables (1.5 mm2 sections) which govern 

the supplementary relays will come out of terminals 2 
and 3 (start and stop). These cables carry the positive 
to the pole of the winding. 

3.7. OPTION WITH PREHEATING 

The units delivered with this option incorporate 

another button on the frontpiece where the timing (in 
seconds), of the preheating to be carried out before 
the attempt at starting, can be programmed. 

To connect the heater, in the connection housing 

there will be a loose terminal which comes from the 
positive. Place a relay like those described above 
here. 

 
 

CONNECTIONS SCHEME 

 

3.8. OPTION FOR PETROL ENGINES 

Only for the units that  they have this option. 
In petrol engines, which generally do not have 

oil pressure gauges, the detection of the start is 
determined by the moment when the alternator begins 
to generate electrical tension. 

For the connection of the unit it is sufficient to 

take one of the poles of the alternating current 
generated by the alternator to input terminal no.5 
before it enters the rectifier. (See the following 
diagram). 

Summary of Contents for diesel controll 100

Page 1: ...f a programmable clock which can be built into the unit b By signals from external elements level sensors another programmer etc c Manually MANUAL START button The activation time of the starter motor...

Page 2: ...the unit will automatically activate the stop relay also keeping the SENSOR BREAKDOWN indicator lit although the breakdown disappears This will only go out on restarting engine again However if the b...

Page 3: ...NG BOX Metal with lock 25x25x8 3 INSTALLATION 3 1 WALL MOUNTING 4 pieces for wall mounting are supplied with the unit which are mounted from the outside and without need to open the unit in the holes...

Page 4: ...r with a similar wire There are engines which need to work with double injection by way of a small electro magnet which will be connected in parallel with the starter The stop outlet terminal 3 can ac...

Page 5: ...positive to the pole of the winding 3 7 OPTION WITH PREHEATING The units delivered with this option incorporate another button on the frontpiece where the timing in seconds of the preheating to be car...

Page 6: ...ted and the WORKING LED does not light up CAUSES Mistaken polarity in the supply The oil pressure gauge is not connected to terminal 5 The oil pressure gauge is defective or does not indicate mass wit...

Page 7: ...7 5 CONNECTION SCHEME OF MISCELLANEOUS OPTIONS Delay option in the pump input Option of 2 irrigation sector with delay in the input pump...

Page 8: ...8 Option of irrigation plus fertiliser with delay in the input pump...

Reviews: