18
BLADE SPINDLE GREASING
:
All SDR models prior to SDR65 s#14365073 and SDR90 S#14390080 are equipped
with greaseable spindle assemblies. The top bearing on all spindle assemblies has a
shield only. This allows grease to exit and relieves any pressure build up inside
spindle housing, when greasing. Greasing of blade spindles should continue until
grease can be seen exiting between the top bearing and the bottom of hub on pulley.
Some working conditions will require this operation to take place every 4 to 5
running hours because of hot working areas. Cooler working areas will only require
greasing every 8 to 10 hours. A proper greasing schedule can only be determined by
operator, depending on working conditions in your particular area.
Summary of Contents for SDR 65
Page 2: ......
Page 3: ...1 ...
Page 5: ...3 ...
Page 12: ...10 ITEM 9 ITEM 10 521451 521455 ITEM 11 SDR 65 ITEM 11 SDR 90 209182 209196 ...
Page 32: ...30 ...
Page 38: ...SDR 90 Parts Manual 2 1 DECK ASSEMBLY 1 1 Blade Spindle Assembly ...
Page 39: ...SDR 90 Parts Manual 3 1 2 Blade Options ...
Page 40: ...SDR 90 Parts Manual 4 1 3 Gear Box Mount ...
Page 41: ...SDR 90 Parts Manual 5 1 4 Deck Assemblies ...
Page 42: ...SDR 90 Parts Manual 6 1 5 Deck Drive ...
Page 43: ...SDR 90 Parts Manual 7 1 6 Deck Roller 2 2018 ...
Page 44: ...SDR 90 Parts Manual 8 1 7 Belt Drive Assembly Rear ...
Page 45: ...SDR 90 Parts Manual 9 2 FRAME ASSEMBLY 2 1 3 PT Hitch Linkage ...