SDR-90 Parts Manual
Maintenance
Maintenance should always be performed by a qualified service
technician familiar with servicing similar equipment, using good
safety and workmanship practices.
Always observe proper lock-out procedures when
performing any maintenance work.
Other than maintaining
the blade spindles or blades, always lower all decks before
performing maintenance. Block and or support machine using
equipment designed for the task. When maintaining blades or
spindles, always ensure locks are seated correctly in place.
When performing hydraulic maintenance, ensure that pressure
has been released.
It is imperative that the operator or qualified service technician
reads and understands all the safety information in the
Operator’s Manual before proceeding. Failure to follow the
instructions or heed the warnings could result in injury or death.
Proper care is your responsibility
.
Summary of Contents for SDR 65
Page 2: ......
Page 3: ...1 ...
Page 5: ...3 ...
Page 12: ...10 ITEM 9 ITEM 10 521451 521455 ITEM 11 SDR 65 ITEM 11 SDR 90 209182 209196 ...
Page 32: ...30 ...
Page 38: ...SDR 90 Parts Manual 2 1 DECK ASSEMBLY 1 1 Blade Spindle Assembly ...
Page 39: ...SDR 90 Parts Manual 3 1 2 Blade Options ...
Page 40: ...SDR 90 Parts Manual 4 1 3 Gear Box Mount ...
Page 41: ...SDR 90 Parts Manual 5 1 4 Deck Assemblies ...
Page 42: ...SDR 90 Parts Manual 6 1 5 Deck Drive ...
Page 43: ...SDR 90 Parts Manual 7 1 6 Deck Roller 2 2018 ...
Page 44: ...SDR 90 Parts Manual 8 1 7 Belt Drive Assembly Rear ...
Page 45: ...SDR 90 Parts Manual 9 2 FRAME ASSEMBLY 2 1 3 PT Hitch Linkage ...