RSD PEFS-EL Series

CONTENT

Summary of Contents for RSD PEFS-EL Series

Page 1: ...www projoy electric com Installation Guide RSD PEFS EL Series...

Page 2: ...evel Rapid Shutdown 1 Scope and General 2 Important Safety Precautions 3 About Rapid Shutdown 4 Operation 5 About PEFS Array level Rapid Shutdown 6 Installation 7 Aftersales service and warranty 8 Con...

Page 3: ...mation of complete disconnection of input power supply Wiring should be done sfter installation of breaker body 2 International Standards IEC 60364 7 712 Electrical installations of buildings Require...

Page 4: ...d create a safe situation When the installation is checked and the PEFS is not affected the PEFS can be switched ON again by removal and re applying the AC voltage to the PEFS The PEFS will also autom...

Page 5: ...core wire MC4 cable 4 8 12 16 20 24 28 32 36 40 1 1 2m for AC power supply 6 Insatllation 6 1 Installation Requirements 6 2 Installation Steps 2 Mount the switch enclosure on the wall Open the box tak...

Page 6: ...ator light and 320mA 4 Wire the string cables to the interface Please follow the marks 1 1 2 2 for PV wiring Note Note Emergency Button Optional 5 Note the installation environment See the schematic o...

Page 7: ...switches on AC POWER ON Approx 35 sec 2 Step 2 Wait one minute UPS is charging Approx 1 min 6 Diagram 1 10 strings Distribution box Firefighter Safety Switch Inverter Grid PV Arrays PV Arrays PV Array...

Page 8: ...fter the repair make a paid repair otherwise it can be replaced with a paid 7 1 Warranty On the premise of user s compliance with reservation and use specifications of the breaker for breakers whose d...