background image

1   Scope and General

2   Important Safety Precautions

The manual only used to PEFS-EL Series Array-level Rapid Shutdown. 

 

Version 

Date 

Remark

 

Chapter

 

V1.0 

2021-10-15 

First Edition

 

-

 

 

www.projoy-electric.com

RSD PEFS-EL Series

1

1. Changes or modifications not explained/approved in this manual voids your authority to operate this equipment.

2. PROJOY shall not be held responsible for any damage caused due to incorrect installation of the product and/or the misun-

derstanding of this manual.

3. PROJOY reserves the right to make any modification to this manual or the information contained herein at any time without 

notice.

4. No design data such as sample pictures provided in this manual may be modified or duplicated except for the purpose of 

personal use.

5. To ensure the recycling of all possible materials and proper disposal treatment of compo- nents, please return the product to 

PROJOY at end-of-life.

6. Check the system regularly (once per 3 months) on faults.

Components in the installations are exposed to high voltages and currents. Follow these instructions carefully in order to reduce 

the risk of fire or electric shock.

The following regulations and standards are considered applicable and mandatory to read prior to the installation of electrical 

equipment:

1. Connection with the main circuit, Wiring should be done bu professional qualified personnel; Wiring should be done after 

confirmation of complete disconnection of input power supply; Wiring should be done sfter installation of breaker body.

2. International Standards: IEC 60364-7-712 Electrical installations of buildings-Require- ments for special installations or 

locations-Solar Photovoltaic (PV) power supply systems. 

3.Local building regulations.

4.Guidelines for lightning and overvoltage protection.

Note!

1. It is essential to uphold the limits for voltage and current in all possible operating conditions. Also keep in mind the literature 

on correct dimensioning and sizing of cabling and components.

2. The installation of these devices may only be performed by certified technical personnel. 

3. The wiring schematics of the Firefighter Safety Switch can be found at the end of this manual.

4. All the installation works should be tested in accordance with relevant local legislation at the time of installation.

3   About Rapid Shutdown

3.1 Intended Use of the Rapid Shutdown

 

The Rapid Shutdown has been especially developed as a safety device for direct current (DC) photovoltaic installations. The DC 

disconnect switch is used to discon- nect the connected strings of the installation in case of an emergency situation. Such an 

emergency situation could be in case of fire.

3.2 Location of the Rapid Shutdown

The Rapid Shutdown needs to be placed as close to the solar panels as possible. Due to its enclosure, the switch is protected 

against external influences like dust and moisture. The whole set-up is conforms to IP66 which makes it suitable for outdoor 

usage when needed.

V2.0

2022-04-20

Content Modified

6 Installation

Summary of Contents for RSD PEFS-EL Series

Page 1: ...www projoy electric com Installation Guide RSD PEFS EL Series...

Page 2: ...evel Rapid Shutdown 1 Scope and General 2 Important Safety Precautions 3 About Rapid Shutdown 4 Operation 5 About PEFS Array level Rapid Shutdown 6 Installation 7 Aftersales service and warranty 8 Con...

Page 3: ...mation of complete disconnection of input power supply Wiring should be done sfter installation of breaker body 2 International Standards IEC 60364 7 712 Electrical installations of buildings Require...

Page 4: ...d create a safe situation When the installation is checked and the PEFS is not affected the PEFS can be switched ON again by removal and re applying the AC voltage to the PEFS The PEFS will also autom...

Page 5: ...core wire MC4 cable 4 8 12 16 20 24 28 32 36 40 1 1 2m for AC power supply 6 Insatllation 6 1 Installation Requirements 6 2 Installation Steps 2 Mount the switch enclosure on the wall Open the box tak...

Page 6: ...ator light and 320mA 4 Wire the string cables to the interface Please follow the marks 1 1 2 2 for PV wiring Note Note Emergency Button Optional 5 Note the installation environment See the schematic o...

Page 7: ...switches on AC POWER ON Approx 35 sec 2 Step 2 Wait one minute UPS is charging Approx 1 min 6 Diagram 1 10 strings Distribution box Firefighter Safety Switch Inverter Grid PV Arrays PV Arrays PV Array...

Page 8: ...fter the repair make a paid repair otherwise it can be replaced with a paid 7 1 Warranty On the premise of user s compliance with reservation and use specifications of the breaker for breakers whose d...

Reviews: