4   Operation

4.1 Normal operation:

The PEFS will automatically switch to the off position, breaking the DC connection between the solar panels and the inverter, 

after the AC power to the PEFS is interrupted for longer than five seconds. The PEFS will automatically switch to the on position, 

restoring the DC connection between the solar panels and the inverter, once the AC power to the PEFS is restored longer than 

five seconds.

4.2 Special Operation:

If the temperature inside the PEFS enclosure exceeds the 70

, the PEFS will automatically switch to OFF to protect the internal 

components and create a safe situation. When the installation is checked and the PEFS is not affected, the PEFS can be 

switched ON again by removal and re-applying the AC voltage to the PEFS. The PEFS will also automatically switch to OFF if 

there is an internal failure. If this occurs please try to reset the PEFS by removal and re-applying the AC voltage to the PEFS.

5   About PEFS Array-level Rapid Shutdown

5.1 Model Description

 

5.2 Technical parameters

2: Generation 2

4: Number of poles
55: Frame Rating

FS: Design Code
PE: Brand Code

P: Plastic enclosure

EL: Product Code

Number of poles

2

4

6

8

10

12

14

16

18

20

Appearance

Frame Rating In(A)

Working temperature

Fiducial temperature

Pollution degree

Protection class

Outline dimensions(mm)

Installation dimensions(mm)

3

IP66

210×200×100

375×225×96

375×225×162

Φ

6×436

Φ

6×269

16

25

32

40

50

55

 -40

+70

 +40

Summary of Contents for RSD PEFS-EL Series

Page 1: ...www projoy electric com Installation Guide RSD PEFS EL Series...

Page 2: ...evel Rapid Shutdown 1 Scope and General 2 Important Safety Precautions 3 About Rapid Shutdown 4 Operation 5 About PEFS Array level Rapid Shutdown 6 Installation 7 Aftersales service and warranty 8 Con...

Page 3: ...mation of complete disconnection of input power supply Wiring should be done sfter installation of breaker body 2 International Standards IEC 60364 7 712 Electrical installations of buildings Require...

Page 4: ...d create a safe situation When the installation is checked and the PEFS is not affected the PEFS can be switched ON again by removal and re applying the AC voltage to the PEFS The PEFS will also autom...

Page 5: ...core wire MC4 cable 4 8 12 16 20 24 28 32 36 40 1 1 2m for AC power supply 6 Insatllation 6 1 Installation Requirements 6 2 Installation Steps 2 Mount the switch enclosure on the wall Open the box tak...

Page 6: ...ator light and 320mA 4 Wire the string cables to the interface Please follow the marks 1 1 2 2 for PV wiring Note Note Emergency Button Optional 5 Note the installation environment See the schematic o...

Page 7: ...switches on AC POWER ON Approx 35 sec 2 Step 2 Wait one minute UPS is charging Approx 1 min 6 Diagram 1 10 strings Distribution box Firefighter Safety Switch Inverter Grid PV Arrays PV Arrays PV Array...

Page 8: ...fter the repair make a paid repair otherwise it can be replaced with a paid 7 1 Warranty On the premise of user s compliance with reservation and use specifications of the breaker for breakers whose d...

Reviews: