background image

3) Step 3. Deactivate AC power circuit. PEFS will switch off in about 7 seconds. Red LED light off.

AC POWER OFF

 

Approx. 7 sec.

4) Step 4. Activate AC power circuit. PEFS switches on in 8 seconds. Red LED light on.

AC POWER ON

 

Approx. 8 sec.

5) Step 5. Test is completed.

7   Aftersales service and warranty

 

www.projoy-electric.com

RSD PEFS-EL Series

6

7.2 Aftersales service

This product is manufactured in a sophisticated quality management system. In case of fault, following warranty and after 

services clauses are applicable.

1) Please contact the supplier or our company's after-sales service department in case of failure;
2) During the warranty period: For failures caused by the company's manufacturing problems, free repairs and replacements;
3) After the warranty period expires: If the function can be maintained after the repair, make a paid repair, otherwise it can be 

replaced with a paid.

7.1 Warranty

On the premise of user’s compliance with reservation and use specifications of the breaker, for breakers whose delivery  date is 

within 60 months from now and whose seals are intact, PROJOY will repair or replace any of these breakers which are damaged 

or cannot work normally due to manufacture quality. However, as for faults caused by following reasons, PROJOY would repair or 

replace the breaker with a charge even it is still in warranty.

1) Due to incorrect use, self-modification and improper maintenance, etc.:
2) Use beyond the requirements of standard specifications;
3) After the purchase, due to falling and damage during installation, etc.;
4) Earthquakes, fires, lightning strikes, abnormal voltages, other natural disasters and secondary disasters, etc.

 

8   Contact us

Projoy Electric Co., Ltd.

Tell

 +86-512-6878 6489

Web:  https://en.projoy-electric.com/

Add:  2nd Floor, Building 3, No. 2266, Taiyang Road, Xiangcheng District, Suzhou

Summary of Contents for RSD PEFS-EL Series

Page 1: ...www projoy electric com Installation Guide RSD PEFS EL Series...

Page 2: ...evel Rapid Shutdown 1 Scope and General 2 Important Safety Precautions 3 About Rapid Shutdown 4 Operation 5 About PEFS Array level Rapid Shutdown 6 Installation 7 Aftersales service and warranty 8 Con...

Page 3: ...mation of complete disconnection of input power supply Wiring should be done sfter installation of breaker body 2 International Standards IEC 60364 7 712 Electrical installations of buildings Require...

Page 4: ...d create a safe situation When the installation is checked and the PEFS is not affected the PEFS can be switched ON again by removal and re applying the AC voltage to the PEFS The PEFS will also autom...

Page 5: ...core wire MC4 cable 4 8 12 16 20 24 28 32 36 40 1 1 2m for AC power supply 6 Insatllation 6 1 Installation Requirements 6 2 Installation Steps 2 Mount the switch enclosure on the wall Open the box tak...

Page 6: ...ator light and 320mA 4 Wire the string cables to the interface Please follow the marks 1 1 2 2 for PV wiring Note Note Emergency Button Optional 5 Note the installation environment See the schematic o...

Page 7: ...switches on AC POWER ON Approx 35 sec 2 Step 2 Wait one minute UPS is charging Approx 1 min 6 Diagram 1 10 strings Distribution box Firefighter Safety Switch Inverter Grid PV Arrays PV Arrays PV Array...

Page 8: ...fter the repair make a paid repair otherwise it can be replaced with a paid 7 1 Warranty On the premise of user s compliance with reservation and use specifications of the breaker for breakers whose d...

Reviews: