background image

4. Starting Your
Generator

Starting

a. Make sure there are no load connected

to the generator

b. Open the fuel cock (open type)
c. Turn the starting key clockwise to

“START” position.

d. Remove your hand from the key as soon

as the engine starts.

e. If the engine does not start after 10

seconds, wait 30 seconds before trying

to start it again.

f. If the engine does not start after 3

attempts, check the battery or call

Promate Service.

If the starter is working for too long,

the battery will go flat and the motor

will seize up. Always leave the

starting key at the “ON” position

when the engine is running.

5. Operating Your
Generator

5.1 Operating your generator

a. Let the engine run without load for 3

minutes.

b. This generator is equipped with a low oil

warning system. The engine will stop

automatically in case of low oil pressure

or a lubrication oil shortage. Check the

oil level and refill if necessary.

c. Do not loosen or adjust the engine

speed limiting bolt or fuel injection

limiting bolt. The generator performs

best at factory settings.

5.2 Checks during operation

Any abnormal sound or vibration?

The engine misfiring or running rough?

What about the color of the exhaust gas

(is it black or too white)?

*If you notice any abnormalities, discontinue

use and contact your Promate Service

immediately.

5.3 Loading your Generator

Set AC circuit breaker to “ON”. Pilot

lamp will illuminate, the speed of

generator must be at 220V-240V

(can be seen on the volt meter on

the control panel).

Insert the plug of the appliance to be

connected. Make sure they are

switched off at the onset then switch

them on one by one starting with

motorized appliances (e.g. air

conditioner) first followed by the

inductive appliances (e.g. rice

cooker, microwave) and finally small

appliances (e.g. lights).

Instruments which require high

starting currents and some kinds of

motors may not run even though

they are rated within the limit of this

generator. Please double check the

STARTING current needed to start

your appliance/device.

The circuit breaker shuts “OFF”

when the current exceeds the surge

output limit or when the applied

instrument is defective.

The running current of the

instruments should not exceed the

rated current showed on the socket,

or else it may damage the machine.

5

Summary of Contents for PM13000D ES OPEN

Page 1: ...DIESEL GENERATOR PM13000D ES OPEN PM13000D ES SILENT OPERATOR MANUAL...

Page 2: ...nerator Set Assembly Components 2 2 1 PM13000D ES Open Components 2 2 2 PM13000D ES Open Components 2 3 Inspection Before Operation 3 3 1 Checking and selecting your engine oil 3 3 2 Selecting and che...

Page 3: ...osed flush thoroughly with water and get immediate medical attention Charge the battery in a fully ventilated place Make sure battery polarity is correct OTHER SAFETY PRECAUTIONS Parts become hot when...

Page 4: ...2 Generator Set Assembly Components 2 1 PM13000D ES Open Components 2 2 PM13000D ES Silent Components 2 2...

Page 5: ...pe it with a rag or paper towel then dip it into the filter neck and pull it back out Add engine oil if the liquid is at or below the lower limit Take care not to add oil beyond the upper limit After...

Page 6: ...l injection pump and nozzle problems Refuel in a well ventilated area with the engine stopped Keep smoke flames or sparks away from fuel both when stored and refueling Do not overfill the tank and mak...

Page 7: ...ry settings 5 2 Checks during operation Any abnormal sound or vibration The engine misfiring or running rough What about the color of the exhaust gas is it black or too white If you notice any abnorma...

Page 8: ...ces e g Aircon b Set the AC breaker to OFF c Unplug the sockets of the electric appliances from the AC output port or extension cord d Let the engine run for 3 minutes with no load e Turn off the gene...

Page 9: ...Promate Service Proper maintenance is not only the basis of safe economical and trouble free generator operation but also helps reduce air pollution Maintenance Schedule Shut off the engine before pe...

Page 10: ...f the oil gauge Finally screw back the cylinder head stud 7 1 b Changing engine oil PM13000D ES Silent Open the left door use a wrench to release the drain plug don t take out the screw put the oil gu...

Page 11: ...running let it cool for 2 hours then clean the surface paint damaged areas and coat with a thin layer of plastic film textile or fabric Fuel Diesel fuel deteriorates during storage which will make st...

Page 12: ...8 Specifications 10 230 230 50...

Page 13: ...with the instructions and recommendations of the Company set forth in the owner s manual or if the product is used as rental equipment The Company will not pay for repairs or adjustments to the produc...

Reviews: