Maintenance manual Universal-1000
P R O M E T A L
33
Point of maintenance
Maintenance work
Maintenance interval
Chain conveyor
Drive shaft
Bearings
Lubricating
Weekly (every 50 hours)
Drive chain
Chain tension
Drive chain, sprocket wheels
Checking
Re-adjusting, cleaning
Weekly (every 50 hours)
If necessary
Transport chain
Transporting chain
Sprocket wheels, skid rails
Chain tension
Checking
Cleaning
Re-adjusting
Weekly (every 50 hours)
Weekly (every 50 hours)
If necessary
Rocker limit switch
Function
Switch position
Setting
Checking
Checking
Re-adjusting
Weekly (every 50 hours)
Monthly (every 200 hours)
If necessary
Check condition of the transport chains
weekly (every 50 hours),
if case of any wear or
damages,
exchange immediately!
Clean the transport chains
weekly (every 50 hours).
Also clean the skid rails below the transport chains.
Rocker limit switch
Summary of Contents for UNIVERSAL 1000
Page 19: ...Maintenance manual Universal 1000 P R O M E T A L 19 ...
Page 25: ...Maintenance manual Universal 1000 P R O M E T A L 25 Hydraulic system ...
Page 26: ...Maintenance manual Universal 1000 P R O M E T A L 26 ...
Page 52: ...Maintenance manual Universal 1000 P R O M E T A L 52 Now lower down tamper head and mould ...
Page 53: ...Maintenance manual Universal 1000 P R O M E T A L 53 Pull out cart with mould on itself ...
Page 58: ...Maintenance manual Universal 1000 P R O M E T A L 58 After adjustment is done ...
Page 65: ...Maintenance manual Universal 1000 P R O M E T A L 65 Vibrator table maintenance ...