ACTIVboard User Guide
5
Installation
Safety Notices
The following precautions must be undertaken before proceeding with any
installation, which involves either fixing to or contact with the fabric of a building.
Determine the presence of potentially hazardous materials, e.g. asbestos,
before commencing work.
Prior to commencing work, consult the building plans if they are available.
Alternatively, seek professional advice on the potential risk of contact with
hazardous materials. If you suspect hazardous materials are present, the
installation must only be undertaken by specialist contractors.
If hazardous materials are found or suspected after commencing work, stop
the installation immediately and evacuate the room.
Notify the Health and Safety or Facilities Management officials and seek
specialist advice.
Ensure you are equipped with suitable protective equipment before
commencing work.
Wear a protective mask to prevent inhalation and ingestion if the installation
requires drilling of materials or contact with dust (either in the air or on surfaces).
Wear suitable eye protection when drilling.
Wear protective gloves in cases where dust is generated and/or insulation
materials are handled.
Installation Options
The wall mounting option allows maximum flexibility for the many types of walls
found in building construction. If you feel that none of the suggested mounting
instructions suit your situation, consult the building plans or a reliable contractor
for further assistance with your installation.
Wall Mounting
Parts supplied:
•
Wall Mount Accessory Kit
•
TP-1443 Installation Leaflet
Plugs and screws are not supplied for fixing the brackets as these can vary
dramatically dependent upon the nature of the wall. You must use the
appropriate fixing for your type of wall.
Summary of Contents for ACTIVboard 78
Page 4: ...ACTIVboard User Guide iv...