6
Assembly
6.1 Wall-mounting
Secure the metering system perpendicular and
upright on a wall or a stable mounting system.
The metering system should be freely accessible.
Select the mounting height you require so that:
n
All components are easily accessible
n
The controller's display can be easily read
n
The controller cover can still be parked in the
[Park position]
(150 mm)
n
There is still space for maintenance work beneath the in-line
probe housing (100 mm)
n
There is still room for the chemical storage tank (600 mm)
n
The fluid level of the full chemical storage tanks is below the
metering pumps
n
The maximum priming lift of the metering pumps is not
exceeded.
10 mm
A0924
1
2
3 4
Fig. 9: Hanger bolt
1 Rawlplug (design depending on the substrate and in line with
the rawlplug manufacturer's instructions)
2 Hanger bolt
3 U-washer
4 Hexagonal nut
Only assemble the system in a separate, well-ventilated and frost-
proof room. Prevent untrained persons from accessing the room by
structural or organisational means. We recommend that you
comply with the requirements for plant rooms in swimming pools
specified in DIN 19643.
If the system is delivered as a collection of loose parts or without
metering pumps for installation by the customer, assemble all com‐
ponents or the external metering pumps as specified in the over‐
Chapter 2.1 ‘Overview of Equip‐
Assembly
20