background image

Promix-SM323

 

 

5

 

 

See operating voltage range in cl. 5.2. Avoid supply of increased voltage. 

Ensure  a  reliable  electric  contact.  To  prevent  short-circuit,  insulate  places  of 
connection. 

6.

 

INSTALLATION AND CONNECTION

 

6.1 LOCK AND LATCH 
MOUNTING 

1.  Mount the lock on a wall, at a distance of 

10mm from the locker wall edge. 

2.  Connect the lock to the power supply  
3.  Insert the latch into the lock. 
4.  Test  operability  of  the  lock 

–  as  voltage 

is  applied,  the  lock  must  push  out  the 
latch. 

5.  Fix the latch on the door. 
6.  Test operability in door closing. 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

6.2 CONNECTING PROCEDURE 

The lock operation is controlled by supplying and blocking power. For this purpose a controller 

(control  board)  or  a  switch  (button)  is  generally  used.  The  controller  is  mounted  in  accordance 
with its certificate. 

Purpose of terminals: 
1

–2 – lock power supply; 

– normally open contact of the lock state sensor; 

– common contact of the sensor; 

– normally open contact of the door sensor; 

Polarity of power supply wire connection does not matter. 

 

 

 

Fig. 4. Lock and latch mounting 

Summary of Contents for SM 323

Page 1: ...el attached to the lock body contains the following information 1 Lock model 2 Nominal supply voltage 3 Nominal consumed current 4 Date of manufacture and QCD mark 5 Identification number 6 Manufacturer s website The color of the product is shown on the label attached to the box after the product name Series colors Silver White Brown Black Other colors are provided optionally 4 ELECTROMECHANICAL L...

Page 2: ...nding on modification the lock is equipped with a door position sensor The sensor is made in the form of a movable stem connected to dry contact 5 TECHNICAL DATA 5 1 OPERATING CONDITIONS The lock operation environment must be explosion safe free of current conducting dust or gases that cause metal corrosion and destroying insulation of current conductors and electric elements free of current carry...

Page 3: ... 2 Current consumed А 0 4 at 12 V Supply pulse width max s 0 5 3 Minimum pause between pulses s 5 Built in sensors lock state sensor lock state sensor door position sensor lock state sensor lock state sensor door position sensor Maximum switching current of the sensor DC А 0 2 Maximum switching voltage of the sensor DC V 24 Sensor output signal type dry contact Lock weight max kg 0 4 Holding force...

Page 4: ...Promix SM323 4 Fig 2 Promix AD DB 21 latch overall and mounting dimensions Fig 3 Promix SM 323 lock overall and mounting dimensions 2 паза 4 holes ...

Page 5: ... lock as voltage is applied the lock must push out the latch 5 Fix the latch on the door 6 Test operability in door closing 6 2 CONNECTING PROCEDURE The lock operation is controlled by supplying and blocking power For this purpose a controller control board or a switch button is generally used The controller is mounted in accordance with its certificate Purpose of terminals 1 2 lock power supply 3...

Page 6: ...ition so that the latch with the door closed enters the lock slot until the catch hook operates The latch does not enter the lock slot or enters with friction Restore position of the door that changed in the course of operation If restoration is impossible adjust the latch 9 MAINTENANCE Maintenance of the lock is performed at least once every two months and includes Visual inspection of the lock t...

Page 7: ...s for human life and health or for the environment disposal after its service life is performed without taking any special measures for environment protection 13 WARRANTY LIABILITIES The manufacturer ETC PROMIX LLC warrants conformity of Promix SM323 locks to requirements of current Technical Specifications provided that transportation storage installation and operation rules established in this M...

Page 8: ...y was manufactured and accepted in compliance with Specifications obligatory requirements of state standards and valid technical documentation recognized as fit for operation and packed by ETC PROMIX LLC Engineering and Production Center PROMIX LLC Russia 214030 Smolensk Krasninskoe sh 35 lit A Phone 4812 619 330 www promix center com facebook com promixcenter mail promix center com ...

Reviews: