PUV-3600HD / PUV-4000HD
SECTION 1
1.4
TABLE 1.1
Requirements for carrying vehicle
UNIT
REQUIREMENTS
Linkage
Front three point linkage
-
Category II according to ISO 730-1
Front loader
-
-
EURO mounting system
ŁC-1650 mounting system
Other
-
compatible with the snow plough's mounting
system
Hydraulic system
Hydraulic oil
-
HL32
Nominal pressure of the system
MPa
16-20*
Hydraulic sockets
-
socket-plug or plug-plug
of ISO 7241-1 type of one hydraulic section,
located on the front of the carrying vehicle
(depending on the snow plough version)
Electrical system
Solenoid supply
-
cigarette lighter socket
(in the operator cab)
Clearance lamps
3-pin or 7-pin socket (option) at the front of
the carrying vehicle
Electrical system voltage
V
12 or 24
(depending on the snow plough version)
Other requirements
Power range:
-for PUV-3600HD
-for PUV-4000HD
hp (kW)
hp (kW)
110 ÷ 220 (80.9 ÷ 161.8)
120 ÷ 250 (88.2 ÷ 184)*
Beacon light
-
orange light**
*- optimum values are given; declared performance and durability of the machine are not guaranteed
for other values.
** - not included in the snow plough equipment
Summary of Contents for PUV-3600HD
Page 2: ......
Page 3: ...SNOW PLOUGH PRONAR PUV 3600HD PRONAR PUV 4000HD MACHINE IDENTIFICATION TYPE SERIAL NUMBER ...
Page 6: ......
Page 9: ...SECTION 1 BASIC INFORMATION ...
Page 19: ...SECTION 2 SAFETY ADVICE ...
Page 29: ...SECTION 3 DESIGN AND OPERATION ...
Page 38: ...PUV 3600HD PUV 4000HD SECTION 3 3 10 ...
Page 39: ...SECTION 4 CORRECT USE ...
Page 58: ...PUV 3600HD PUV 4000HD SECTION 4 4 20 ...
Page 59: ...SECTION 5 MAINTENANCE ...
Page 82: ...PUV 3600HD PUV 4000HD SECTION 5 5 24 ...
Page 83: ...NOTES ...