5.16
Fully unscrew the bolt of the brake crank mechanism (1).
Dismantle shackle (6), loosen nuts (5) of cable clamps (4).
Dismantle cable (2).
Lubricate parking brake mechanism (1) and pins of cable guide rollers (6).
Install new cable, adjust cable tension.
After the first loading of cable, re-check the condition of cable ends, correct if
necessary.
FIGURE 5.8
Installation of steel cable
(1) steel cable, (2) clamp jaw, (3) thimble, (4) nut, (5) heat shrink tubing
Installation of steel cable
Secure cable ends by means of heat shrink tubing (5).
Install thimble (3) on cable (1).
Install clamp jaws (2) and tighten nuts (4).
The distance between the clamps should be at least 15 mm.
Clamp jaws must be placed on the side of the load bearing cable - see figure
(5.8).
The first clamp should be placed directly on the thimble.
Summary of Contents for RC2100-2
Page 2: ......
Page 6: ......
Page 10: ...5 11 TROUBLESHOOTING 5 31 ...
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 24: ...PRONAR RC2100 2 SECTION 1 1 14 ...
Page 25: ...SECTION 2 SAFETY ADVICE ...
Page 40: ...Pronar RC2100 2 SECTION 2 2 16 FIGURE 2 3 Locations of information and warning decals ...
Page 41: ...SECTION 3 DESIGN AND OPERATION ...
Page 59: ...SECTION 4 CORRECT USE ...
Page 78: ...Pronar RC2100 2 SECTION 4 4 20 ...
Page 79: ...SECTION 5 MAINTENANCE ...
Page 110: ...Pronar RC2100 2 SECTION 5 5 32 FIGURE 5 12 Lubrication points part 1 ...
Page 111: ...SECTION 5 Pronar RC2100 2 5 33 FIGURE 5 13 Lubrication points part 2 ...
Page 119: ...NOTES ...
Page 120: ... ...
Page 121: ...ANNEX A Tyre dimensions LP TYRES WHEEL RIM 1 215 75 R17 5 135 133 J 17 5x6 75 ...