5
PRONAR T672ECO
Introduction
CHECKING THE MACHINE AFTER DELIVERY
The manufacturer ensures that the ma-
chine is fully functional, has been checked
in accordance with control procedures and
is approved for use. However, this does
not release the user from the obligation
to check the machine after delivery and
before first use. The machine is delivered
to the user completely assembled. De-
tailed information on the transfer can be
found in the WARRANTY BOOK.
CONTROL RECOMMENDATIONS
• Check the completeness of the ma-
chine in accordance with the order
(standard and optional equipment).
• Check the machine for missing parts
or damage resulting from incorrect
transport of the machine to its desti-
nation point (dents, punctures, bends
or broken parts, etc.).
• Check technical condition of guards,
safety devices.
• Check the condition of the paint
coating, check for any signs of
corrosion.
• Check the condition of the tires on
the road wheels and the air pressure
in the tires.
• Check the correct tightening of the
wheels.
• Check the technical condition of the
drawbar eye and its attachment.
• Check the technical condition of the
flexible hydraulic hoses.
• Check technical condition of pneu-
matic conduits.
• Make sure there are no hydraulic oil
leaks.
• Check the machine's lighting electric
lamps.
• Check the electrical controls (panel,
harness).
• Check cylinders for hydraulic oil
leaks.
In case of any irregularities found, report
them directly to the seller to remove any
defects.
U.11.2.EN
ADVICE
The delivery of the machine includes a detailed in-
spection and check of the operation of the machine,
as well as instructing the buyer on the basic prin-
ciples of use. The first start -up takes place in the
presence of the Seller.
Summary of Contents for T672ECO
Page 3: ...INTRODUCTION ...
Page 10: ...Introduction 8 PRONAR T672ECO ...
Page 11: ......
Page 12: ......
Page 15: ......
Page 16: ......
Page 17: ...GENERAL CHAPTER 1 ...
Page 32: ...SAFETY OF USE CHAPTER 2 ...
Page 51: ...Chapter 2 Safety of use 2 20 PRONAR T672ECO ...
Page 52: ...CONSTRUCTION AND PRINCIPLE OF OPERATION CHAPTER 3 ...
Page 71: ...RULES OF USE CHAPTER 4 ...
Page 101: ...PERIODIC INSPECTIONS OF THE TRAILER CHAPTER 5 ...
Page 131: ...TECHNICAL SUPPORT CHAPTER 6 ...
Page 147: ......
Page 148: ......
Page 150: ...APPENDIX A A 2 PRONAR T672ECO ...