P10
C5
請檢查
2
組
紅色活
塞帽(小)
小技巧提醒 :
若
P10
在組裝時出現扭轉,請使用
C5
協助調整。
46
Red Cap
(Small)
2
Tip :
Use C5 to make it smooth if P10 was
twisted during assembly.
47
D5
D5
D2
D2
請確認
D2/D5
是否安裝於如下正確位置,請參考第
17
頁─步驟
2
3-1
如果打氣時壓力表指針靜止不動
請確認指針是否安裝正確,請參考第
11
頁─步驟
12
2-2
3-2
請確認空氣管是否被夾住,請參考以上第
2-2
敘述
2-1
如果空氣軟管於打氣時鬆脫
請確認連接處是否沾到油: 將空氣管自連接處拔除,將油擦掉並使用中性清潔劑清潔乾淨。
請確認空氣管是否被夾住: 輕拉空氣管(如下圖所示),如可移動表示組裝時空氣管沒有被夾住。
2
3
4
Check if D2 / D5 are installed in the right direction. ( refer to page17, step 2 )
If the pressure meter does not function while pumping.
Check if pointer is installed correctly ( refer to page 11, step 12 )
Check if air tubes are clamped during assembly. Slightly pull the tube (as shown below) to make
sure it is freely moving without clamp.
Check if air tubes are clamped ( refer to Trouble Shooting 2-2 )
If air tubes are loosened while pumping.
Check if connectors are stained by oil. Take off the connectors/air tubes, make sure to wipe off the
oil and use neutral detergent to clean the parts thoroughly.
Summary of Contents for GE-631
Page 1: ...Manual Assembly Instruction 組裝說明手冊 GE 631 空氣動力引擎車 Air Engine Car Kit ...
Page 17: ...30 23 24 1 31 25 4 3 2 1 ...
Page 18: ...D6 C4 32 26 27 2 3 2 4 5 1 1 6 1 P19 P19 02 02 比例 1 1 P1x5 33 28 29 Top View 上視圖 Scale 1 1 ...
Page 22: ...1cm B11 40 P18x5 42 43 41 恭喜完成 P19 P19 06 07 44 Finished ...