40
1
3
4
2
38cm
3
1
3
1
2
H3
2
將液壓筒裝滿水
液壓筒
軟 管
將活塞推到底部
推到底部
拉到頂部
液壓筒
Press down the piston to the bottom
連 接
H 3
和
I 3
Connect H3 With 3
Push to the end
Pull up entirely
Tube
Cylinder
Fill up the cylinder
with water
Cylinder
41
1
3
4
2
H2
56cm
2
2
1
2
將液壓筒裝滿水
液壓筒
軟 管
推到底部
拉到頂部
液壓筒
連 接
H 2
和
I 2
Connect H2 With 2
Push to the end
Pull up entirely
Cylinder
Cylinder
Tube
Fill up the cylinder
with water
Summary of Contents for GE-632
Page 1: ...GE 632 Hydraulic Robot Arm...
Page 6: ...8 3 P2 1 1 9 P2 4 5 1 2 1 2 E16 G6 1 1...
Page 9: ...14 4 D2 D3 P2 P2 5 E13 180 1 1 15 6 7 P2 C9 G10 D4 P2x2 1 1 2 E26 Forearm Wrist...
Page 17: ...30 E20 12 14 13 2 2 1 1 P8 C19 Side View PUSH PUSH 31 A7 1 1 2 15...
Page 28: ...52 3 2 3 1 click click click click Push 53 4 5 6 1 2 H0 3 PUSH PULL Cylinder PUSH PUSH...
Page 31: ...58 3 2 1 3 click click click click PUSH PUSH 59 4 5 6 1 2 3 PUSH PULL PUSH PUSH...
Page 34: ...64 3 2 3 1 Click Click Push 65 5 4 6 1 2 3 PUSH PULL PUSH...
Page 37: ...70 10 1 2 Marking 71 2 1 11 12 4 3 Cylinder Ensure the right direction...