48
H4
液壓筒
Cylinder
H5
液壓筒
Cylinder
4
液壓筒
Cylinder
5
液壓筒
Cylinder
42cm (16.54 inches)
53cm (20.87 inches)
T
ube
軟管
4
T
ube
軟管
5
13.5 cm
15.5 cm
5.5 cm
14.5 cm
(2.17 inches)
(5.31 inches)
(6.10 inches)
(5.71 inches)
49
壓到底
壓到底
將
G19
壓到底部
1
2
G19
G19
C1
P2
E29
P5
G19
非常重要! P5 墊片必須乾淨不能沾到油,組裝前請注意手是乾淨且P5是乾燥的
請做
10
組
請做
5
組
操 縱 桿 組 裝
Lever Controller Assembly
Very Important !
P5 (Brake Pad) must be clean and not stained by oil.
Make sure to hand clean and dry P5 before assembly.
10
Push g19 to the bottom
PUSH
PUSH
PUSH
PUSH
5
1:1
Summary of Contents for GE-632
Page 1: ...GE 632 Hydraulic Robot Arm...
Page 6: ...8 3 P2 1 1 9 P2 4 5 1 2 1 2 E16 G6 1 1...
Page 9: ...14 4 D2 D3 P2 P2 5 E13 180 1 1 15 6 7 P2 C9 G10 D4 P2x2 1 1 2 E26 Forearm Wrist...
Page 17: ...30 E20 12 14 13 2 2 1 1 P8 C19 Side View PUSH PUSH 31 A7 1 1 2 15...
Page 28: ...52 3 2 3 1 click click click click Push 53 4 5 6 1 2 H0 3 PUSH PULL Cylinder PUSH PUSH...
Page 31: ...58 3 2 1 3 click click click click PUSH PUSH 59 4 5 6 1 2 3 PUSH PULL PUSH PUSH...
Page 34: ...64 3 2 3 1 Click Click Push 65 5 4 6 1 2 3 PUSH PULL PUSH...
Page 37: ...70 10 1 2 Marking 71 2 1 11 12 4 3 Cylinder Ensure the right direction...