Installation and Initialization
QB.11-R Installation and Management
Installation Procedure
19
Installation Procedure
NOTE:
•
The
Configure System
window provides a selectable
Country
field that automatically provides the allowed
bandwidth and frequencies for the selected country as well as, where applicable, Dynamic Frequency Selection
(DFS) and Transmit Power Control (TPC).
•
Be sure to read the
Release Notes
file on the product CD as it contains software version and driver information
that may not have been available when this document was produced.
•
Equipment is to be used with, and powered by, the power injector provided or by a power injector that meets
these requirements:
–
UL-Listed/ITE (NWGQ)
–
Limited Power Source Output per UL/IEC 60950
–
CE-marked
–
Approved for Power-over-Ethernet
–
Rated output, 48 Vdc/0.42 A
–
Wired according to the 802.3af standard for mid-span devices
See the following steps:
•
•
•
•
•
Step 5: Determine Proper Mounting Orientation
•
Step 6: Assemble Mounting Hardware
•
Step 7: Perform Confidence Test (Optional)
•
•
IMPORTANT:
Before installing and using this product, see Safety and Regulatory Compliance Information on the
product CD.
IMPORTANT:
All units must be installed by a suitably trained professional installation technician or by a qualified
installation service.
WARNING:
To ensure proper grounding, use the hole at the bottom point on the back of each unit and the provided
grounding screws to attach a ground wire of at least 10 AWG stranded to each unit. Use proper wire
grounding techniques in accordance with local electric codes.