5-9
ROTALIGN 01.2000
Vertical machine alignment - results
4) Results
When measurement is complete, press the "Results" key:
These are the alignment corrections. The display shows the
flange viewed from above. The first measurement position is at
the top of the screen.
On the left portion of the screen are the offsets: in the above
example these are 0.29 mm towards the back and 0.12 mm to the
right.
In the right portion of the screen is a table of the calculated shims
(in mm in this example) at each bolt position. In the above
example the table is titled "Shim (+)" which means that shims
are all positive, i.e. the shims are all added. Press the
"+/-" key to display negative shim values, i.e. shims removed (-).
The minimum change (+/-) can be displayed by pressing the
"+/-" softkey again. The final option available under the "+/-"
softkey normalizes the smallest shim thickness to zero and makes
all other shims positive (0+).
Browse through the list with the arrow keys. The corresponding
bolts are highlighted in the table.
5) Fit shims
Position the shaft so that the number 1 is aligned with the
reference mark. Press the MOVE softkey. An intermediate screen
will appear, prompting you to press the START softkey. After
pressing the key, loosen the bolts and fit the shims according to
the table values. Try to keep horizontal movement to a minimum.
When finished, retighten the bolts. Press the stop key when
finished. The results after the move will now be displayed in the
results table. Confirm your results be remeasuring.
Page 3-6
MOVE
MOVE
+/-
Summary of Contents for ROTALIGN ALI 3.500
Page 13: ...1 10 ROTALIGN 01 2000 This page intentionally left blank ...
Page 103: ...4 66 ROTALIGN 01 2000 This page intentionally left blank ...
Page 121: ...5 18 ROTALIGN 01 2000 This page intentionally left blank ...
Page 143: ...6 22 ROTALIGN 01 2000 This page has intentionally been left blank ...
Page 158: ...6 37 ROTALIGN 01 2000 This page intentionally left blank ...