You may find it easier to install the shelf securing thumb screws if you gently
lift up on the out edge of the shelf while you thread in the thumb screws as
shown in the photo below:
13.
Locate the remaining Large shelf and another four (4) 1.4-
10 x 2.00” thumb
screws. Install the remaining Large Shelf in the same way you installed the
first shelf in step 12 above. The location of this second shelf is up to you.
We recommend that you install it as shown in the photo below so that it is
located flush with the bottom of the “top” set of uprights. If you locate this
second shelf at this position, the top half of the cart will sit flat on this second
shelf when removed. (see photo below)
14.
Locate the small shelf and four (4) of the ¼-20 LONG Thumb Screws.
Position the shelf in your desired location and gently start the thumb screws
as you did with the other shelves. DO NOT FULLY TIGHTEN AT THIS
TIME. FINAL TIGHTENING WILL BE DONE AFTER THE CART IS
COMPLETELY ASSEMBLED!