background image

 

PSI Waste Equipment Services, Inc. 

P50 Apartment Compactor 

Sec

Ɵ

on 2, Installa

Ɵ

on 

 

Electrical Requirements

 

Motor

 

Size

 

VAC

 

Phase

 

NEC

 

FLA

 

Dual

 

Element

 

Fuse

 

Max

 

Circuit

  

Breaker

 

Max

 

Minimum

 

Wire

 

Size

 

(60

 

deg

 

C)

 

3HP

 

208/1Ph

 

18.7

 

35

 

50

 

10

 

3HP

 

230/1Ph

 

17

 

30

 

45

 

10

 

5HP

 

208/3Ph

 

16.7

 

30

 

45

 

10

 

5HP

 

230/3Ph

 

15.2

 

30

 

40

 

12

 

5HP

 

460/3Ph

 

7.6

 

15

 

20

 

12

 

The

 

P50

 

control

 

panel

 

is

 

rated

 

NEMA

 

3R

 

for

 

indoor

 

or

 

outdoor

 

use

 

UL

 

Listed.

  

See

 

the

 

chart

 

below

 

for

 

branch

 

circuit

 

informa on.

   

Slab Requirements 

Summary of Contents for VERSA-PAK P50

Page 1: ...Apartment Compactor PSI Waste Equipment Services Inc Safety Opera on and Installa on Manual 11 23 2020 v P50BA...

Page 2: ...te Space Requirements 4 Electrical Slab Requirements 5 Sec on 3 Opera on Changing Containers 6 Control Panel 7 Normal Opera onal Characteris cs Manual 8 Normal Opera onal Characteris cs Auto 9 Fault C...

Page 3: ...e compactor on the market About this manual This manual provides the installer owner and operator with informa on needed to install maintain and operate the P50 compactor You must also comply with loc...

Page 4: ...Lock Out Power Unit 1 300018 Danger Shock Arc Flash 1 300019 Danger Starts Automa cally 2 Loca on Doors inside and outside Feed areas and controls All sides of compactor Feed areas and controls Hopper...

Page 5: ...PSI Waste Equipment Services Inc P50 Apartment Compactor Sec on 1 Safety and Responsibili es 2 Safety Decals...

Page 6: ...o employees Ensure employees understand and follow Operator Responsibili es and safety decals Ensure only authorized and qualified employees have access to the compactor Properly maintain compactor an...

Page 7: ...PSI Waste Equipment Services Inc P50 Apartment Compactor Sec on 2 Installa on 4 Site Space Requirements...

Page 8: ...l Element Fuse Max Circuit Breaker Max Minimum Wire Size 60 deg C 3HP 208 1Ph 18 7 35 50 10 3HP 230 1Ph 17 30 45 10 5HP 208 3Ph 16 7 30 45 10 5HP 230 3Ph 15 2 30 40 12 5HP 460 3Ph 7 6 15 20 12 The P50...

Page 9: ...fore unhooking container make sure ram is in rear posi on Press the E Stop bu on and turn the key switch to the O posi on Unlatch container as shown Remove container and place in staging area Roll new...

Page 10: ...PSI Waste Equipment Services Inc P50 Apartment Compactor Sec on 3 Opera on 7 Control Panel...

Page 11: ...mmediately move forward to begin another cycle If the E STOP is pressed a door is opened or the KEY SWITCH is turned o the cycle will stop and the motor will shut o When the START bu on is pressed aga...

Page 12: ...to look for more trash Momentary blocking of the eye falling trash will have no e ect When the eye is blocked for 5 full sec onds the warning horn will sound If the eye con nues to stay blocked for th...

Page 13: ...me normal opera on See se ngs below for more informa on Danger Only qualified and authorized personnel should a empt the following To use Sleep Mode you ll have to set the clock on the Versa Pak syste...

Page 14: ...Ram Face Force psi 27 1 Pack Out Ram Face Force psi 31 5 Ram Penetra on in 5 Weight lbs 1 876 Electrical Tri Volt Motor 208 230 460 5HP Electric Control Voltage 120 VAC Hydraulic Hydraulic Pump Capac...

Page 15: ...PSI Waste Equipment Services Inc P50 Apartment Compactor Sec on 5 Maintenance 12 Parts...

Page 16: ...ure the padlock prevents the disconnect from being turned on Keep the key with you 5 Now make sure you can not start the compactor 6 Relieve pressure from hydraulic system by pushing in on each side o...

Page 17: ...1 2 of top of s ck If more than 1 gallon 5 8 of oil is being lost per year call a qualified compactor repair company and have them check the cylinders and hoses for leaks Clean trash from under and ar...

Page 18: ...PSI Waste Equipment Services Inc P50 Apartment Compactor Sec on 5 Maintenance 15 Hydraulic Schema c...

Page 19: ...PSI Waste Equipment Services Inc P50 Apartment Compactor Sec on 5 Maintenance 16 Electrical Schema c...

Page 20: ...isuse negligence or other losses not caused by defects in manufacturing Normal maintenance cleaning Abrasion or damage to exterior hoses Loss of use temporary service consequen al or incidental damage...

Reviews: