PTS 90
123
Series Small Cell
AC Power Distribution Load Centers
Installation Guide
1
7
All Rights Reserved, 2018
888-820-3508
5.
5
Labeling the Breakers
Caution: Installation shall be completed per all NEC and Local Codes. Do not install
PTS90
123
Systems before reading and understanding all specifications and
installation guides provided. Installation should be performed by a qualified installer.
5.
5
.1
If
installed as Service Equipment, apply the "SERVICE DISCONNECT" label at the
primary breaker positions
5.
5
.2
If
installed as Branch Equipment, apply the "MAIN DISCONNECT" label at the
primary breaker positions
5.
5
.
3
Label Load Breakers accordingly
www.pactechsol.com
www.pactechsol.com
/ATTVendor