background image

PTS 90

4

23

 Series Small Cell 

AC Power Distribution Load Centers 

Installation Guide

 

4

All Rights Reserved, 2018

888-820-3508

PTS90

4

23

 Outline Drawing 

Caution: Installation shall be completed per all NEC and Local Codes. Do not install 
PTS90

4

23

 Systems before reading and understanding all specifications and

 

installation guides provided. Installation should be performed by a qualified installer.

 

Figure 2: Dimensional Drawings

 

Example with Dual SPD 

and 5 Load Positions

  www.pactechsol.com

www.pactechsol.com

 

Summary of Contents for PTS90423 Series

Page 1: ...Switch Suitable for Use as Service Equipment Small Cell Pico Micro CRAN or Macro INSTALLATION GUIDE Compact 120V AC Power Distribution Load Center 60AMP Main Breaker with External Rotary Disconnect S...

Page 2: ...s 9 3 1 Steps to Inspect and Remove 9 4 0 Mounting 9 4 1 Mounting Bracket 9 4 2 Mounting to Pole Stanchion or Round Surfaces 10 Figure 3 Mounting Example 11 4 3 Mounting to flat surfaces 11 Figure 4 M...

Page 3: ...ell AC Power Distribution Load Centers provides a custom factory fully assembled load center for Small Cell and CRAN deployments PTS90423 Small Cell AC Power Distribution Load Center Figure 1 PTS90423...

Page 4: ...tion Installation shall be completed per all NEC and Local Codes Do not install PTS90423 Systems before reading and understanding all specifications and installation guides provided Installation shoul...

Page 5: ...14 4 awg Cu Al Rated Conditional Short 10kAIC SPD Dual MOV L N N G 20Ka 8 20us Nominal External Ground Connection 2 hole 20 w 5 8 spacing Physical Housing Material Powder Coated Aluminum Breaker Acces...

Page 6: ...Breaker 12 AMP PT KM1N 16A UL489A DIN rail Breaker 16 AMP Torque Recommendations Main QOU Breaker 42 47 in lbs Load Breaker 17 22 in lbs Surge Protection 17 22 in lbs Neutral Block and Bar 24 27 in lb...

Page 7: ...efore reading and understanding all specifications and installation guides provided Installation should be performed by a qualified installer Drawing above shows equipped with Neutral to Ground Bond R...

Page 8: ...as a sub tending branch panel when modernizing or expanding existing sites 2 0 Features The PTS90423 Series of Small Cell AC Load Centers packaged as a custom configuration ready for install in new an...

Page 9: ...e reading and understanding all specifications and installation guides provided Installation should be performed by a qualified installer 4 0 Mounting The PTS90423 Systems are certified for outdoor in...

Page 10: ...ble location for mounting 4 2 2 Install Pole Straps and tighten per specifications or 4 2 3 Mark and drill anchors locations using template provided 4 2 4 Wood Poles should be Lag Bolted or Through Bo...

Page 11: ...Mounting enclosure on flat surfaces 4 3 1 Customer is responsible to identify suitable location for mounting 4 3 2 Mark and drill anchors or clips to secure enclosure to surface 4 3 3 Torque to mounti...

Page 12: ...Connection Points 5 1 4 Review Neutral Connection points 5 2 Wiring Ground Connections 5 2 1 Ensure enclosure is grounded as per NEC and Local Jurisdictions Code requirements 5 2 2 If Using for Servic...

Page 13: ...nternal ground bar 5 3 3 Wire the Service Neutral to Neutral bar connection according to use and Local Jurisdictional Code 5 3 4 If wiring for Service Entrance ensure that the provided bond strap is c...

Page 14: ...igure 6 Standard Wiring Practice Example Caution Installation shall be completed per all NEC and Local Codes Do not install PTS90423 Systems before reading and understanding all specifications and ins...

Page 15: ...Dead Front Access Plate set screw and tighten 5 4 3 Check to ensure all breakers are sitting square in the dead plate opening 5 4 4 Check to ensure all blank breaker positions are covered Caution Ins...

Page 16: ...Systems before reading and understanding all specifications and installation guides provided Installation should be performed by a qualified installer 5 5 1 If installed as Service Equipment apply th...

Page 17: ...llation verifying that all is in accordance with this document NEC and local Codes Caution Installation shall be completed per all NEC and Local Codes Do not install PTS90423 Systems before reading an...

Page 18: ...om Cooleen Date 06 05 2018 File Location www pactechsol com Revision Control Issue Number 09 Date 09 05 2018 Description PTS90423 Series Installation Guide Prime Contact 1 Name UID Phone Department Re...

Reviews: