PTS 90
4
23
Series Small Cell
AC Power Distribution Load Centers
Installation Guide
1
0
All Rights Reserved, 2018
888-820-3508
3.0 Inspecting and Unpacking of PTS90
4
23
Series Load Centers
3.0.
1
Inspect the packaging for obvious signs of rough handling and/or external damage.
3.0.
2
Review Installation Guide.
3.0.
3
Remove from plastic packaging.
Caution: Installation shall be completed per all NEC and Local Codes. Do not install
PTS90
4
23
Systems before reading and understanding all specifications and
installation guides provided. Installation should be performed by a qualified installer.
4.0 Mounting
The PTS90
4
23
Systems are certified for outdoor installations This section
provides
installations guidelines to insure the appropriate requirements are met.
4.1 Mounting Bracket
4.1.1 A mounting bracket is included and pre-installed with the enclosure and can be used
as a template, or the mounting bracket detail on page 4 can be used, if preferred.
4.1.2 If mounting bracket is removed, a lock-tite like adhesive should be applied to the
screws when replacing.
www.pactechsol.com
www.pactechsol.com