CT10.241, CT10.241-C1
CT-Series
3-P
HASE
,
24V,
10A,
240W
May 2018 / Rev. 2.0a DS-CT10.241-EN All values are typical figures specified at 3x 400Vac, 50Hz input voltage, symmetrical
phase voltages, 24V, 10A output load, 25°C ambient and after a 5 minutes run-in time unless otherwise noted.
www.pulspower.com Phone +49 89 9278 0 Germany
12/28
12.
L
IFETIME
E
XPECTANCY
The Lifetime expectancy shown in the table indicates the minimum operating hours (service life) and is determined by
the lifetime expectancy of the built-in electrolytic capacitors. Lifetime expectancy is specified in operational hours and
is calculated according to the capacitor’s manufacturer specification. The manufacturer of the electrolytic capacitors
only guarantees a maximum life of up to 15 years (131 400h). Any number exceeding this value is a calculated
theoretical lifetime which can be used to compare devices.
3AC 400V
3AC 480V
Lifetime expectancy
54 000h
62 000h
At 24V, 10A and 40°C, 3-phase operation
133 000h
134 000h
At 24V, 5A and 40°C, 3-phase operation
41 000h
47 000h
At 24V, 12A and 40°C, 3-phase operation
151 000h
176 000h
At 24V, 10A and 25°C, 3-phase operation
376 000h
379 000h
At 24V, 5A and 25°C, 3-phase operation
116 000h
133 000h
At 24V, 12A and 25°C, 3-phase operation
Lifetime expectancy
48 000h
58 000h
At 24V, 10A and 40°C, 2-phase operation
134 000h
145 000h
At 24V, 5A and 40°C, 2-phase operation
36 000h
42 000h
At 24V, 12A and 40°C, 2-phase operation
135 000h
164 000h
At 24V, 10A and 25°C, 2-phase operation
379 000h
410 000h
At 24V, 5A and 25°C, 2-phase operation
102 000h
119 000h
At 24V, 12A and 25°C, 2-phase operation
13.
MTBF
MTBF stands for
M
ean
T
ime
B
etween
F
ailure, which is calculated according to statistical device failures, and indicates
reliability of a device. It is the statistical representation of the likelihood of a unit to fail and does not necessarily
represent the life of a product.
The MTBF figure is a statistical representation of the likelihood of a device to fail. A MTBF figure of e.g. 1 000 000h
means that statistically one unit will fail every 100 hours if 10 000 units are installed in the field. However, it can not
be determined if the failed unit has been running for 50 000h or only for 100h.
For these types of units the MTTF (
M
ean
T
ime
T
o
F
ailure) value is the same value as the MTBF value.
3AC 400V
3AC 480V
MTBF SN 29500, IEC 61709
975 000h
985 000h
At 24V, 10A and 40°C, 3-phase operation
1 706 000h
1 723 000h
At 24V, 10A and 25°C, 3-phase operation
925 000h
939 000h
At 24V, 10A and 40°C, 2-phase operation
1 633 000h
1 656 000h
At 24V, 10A and 25°C, 2-phase operation
MTBF MIL HDBK 217F
444 000h
428 000h
At 24V, 10A and 40°C, 3-phase Ground Benign GB40
584 000h
563 000h
At 24V, 10A and 25°C, 3-phase Ground Benign GB25
100 000h
100 000h
At 24V, 10A and 40°C, 3-phase Ground Fixed GF40
132 000h
132 000h
At 24V, 10A and 25°C, 3-phase Ground Fixed GF25
436 000h
423 000h
At 24V, 10A and 40°C, 2-phase Ground Benign GB40
555 000h
572 000h
At 24V, 10A and 25°C, 2-phase Ground Benign GB25
98 000h
98 000h
At 24V, 10A and 40°C, 2-phase Ground Fixed GF40
129 000h
129 000h
At 24V, 10A and 25°C, 2-phase Ground Fixed GF25