background image

 

 

 

4. The RACK cabinet mounting instructions: 

 

 

The RACK 19" Standing Cabinet for assembling is supplied in 5 separate packages. 

 
4.1)

 Lay horizontally two 

frames 

of the RACK cabinet (package 2/5 and 3/5) 

 

 

Fig.1 

 

4.2)

 Connect the 

bottom plate

 and the 

top plate

 to the 

cabinet frame

 from the left side and the right side of the RACK cabinet, 

respectively. (package 1/5).  Use bolts with nuts (16 pcs - package 1/5). Mount wheels

 

and

 leveling legs

 to the 

bottom plate

 of the 

cabinet (package 1/5). 

 
 
 

 

 

Fig.2 

 

 

4.3)

 Place the RACK cabinet vertically. 

 

 

 

 

Fig.3 

 
 
 
 
 
 
 
 
 

 
 

Summary of Contents for RS4281GD

Page 1: ... RAL 9004 latched rear door cold rolled steel SPCC 1 2mm RAL 9004 hinged Static load 800 kg with leveling legs Application indoor IP20 Notes the possibility to change the spacing between the front and rear RACK profiles ventilation holes in the top and bottom plate of the cabinet and in the front door the possibility of mounting a panel of 4 fans to the upper plate RAWP1000 cable glands in the bot...

Page 2: ...e RACK cabinet package 2 5 and 3 5 Fig 1 4 2 Connect the bottom plate and the top plate to the cabinet frame from the left side and the right side of the RACK cabinet respectively package 1 5 Use bolts with nuts 16 pcs package 1 5 Mount wheels and leveling legs to the bottom plate of the cabinet package 1 5 Fig 2 4 3 Place the RACK cabinet vertically Fig 3 ...

Page 3: ...t frames at the 1 4 1 2 and 3 4 height of the cabinet as shown in the Fig 4 Fig 4 4 5 Mount two cage nuts at the front and back of the Transverse profiles package 1 5 as in the Fig 5 Fig 5 4 6 Install transverse profiles from the inside as shown in the Fig 6 Fig 6 ...

Page 4: ...4 7 Screw distances to the transverse profiles as shown in the Fig 7 Fig 7 4 8 Screw the RACK profiles to the mounted distances as shown in the Fig 8 Fig 8 ...

Page 5: ...4 9 Screw the vertical cable organizers to the mounted distances as in the Fig 9 Fig 9 ...

Page 6: ...4 10 Mount the side rear and front door to the RACK cabinet Fig 10 Fig 10 ...

Page 7: ... Sp j Siedlec 150 32 744 Łapczyca Phone 14 610 19 40 Fax 14 610 19 50 E mail biuro pulsar pl www pulsar pl www zasilacze pl WARRANTY 12 months from the date of purchase WARRANTY VALID only upon presentation of the original invoice ...

Reviews: