background image

 

2.  Installation 

2.1. Requirements 

The device should be mounted by a qualified installer, holding relevant permits and licenses (applicable and  required  for  

a  given  country)  for  230V AC  and  low-voltage  installations.  

 
The  device  shall  be  mounted  in  confined  spaces,  according  to  the  environment  class  II,  with  normal  air  humidity 

(RH=90% max. without condensation) and the temperature from -

10°C to +40°C.  

The  switch  shall  work  in  a  vertical  position  that  guarantees  sufficient  convectional  air-flow  through  ventilating  holes  of  the 
enclosure.  

 
Before installation, prepare a Switch'a load balance.  

 
The given value of 30W per port is the maximum value referring to a single output. The total power consumption 

should not exceed 120W when all PoE ports are being used

. The increased demand for power is particularly evident in the 

case of cameras with heaters or infrared illuminators - when launching these features, the power consumption increases rapidly, 
which  may  adversely  affect  the  operation  of  the  switch.  As  the  device  is  designed  for  a  continuous  operation  and  is  not 
equipped  with  a  power-switch,  therefore  an  appropriate  overload  protection  shall  be  guaranteed  in  the  power  supply  circuit. 
Moreover, the user shall be informed about the method of unplugging (usually through assigning an appropriate fuse in the fuse-
box). The electrical system shall follow valid standards and regulations. 
 

2.2.  Installation procedure 

1. Before installation, cut off the voltage in the 230V power-supply circuit. 
2. Mount the PSU in a selected location and connect the wires.  
3. Connect the power cables (~230V AC) to L-N clips of the PSU.  
 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow 

and green wire coat of the power cable shall stick to one side of the terminal - marked 

with ‘

 symbol on the PSU enclosure. Operation of the PSU without the properly 

made and fully operational shock protection circuit is UNACCEPTABLE! It can cause a 

device failure or an electric shock. 

 

4.  Connect the ground wire to the terminal marked with the 

 symbol (power supply module connector). Use a three-

core cable (with a yellow and green PE protection wire) to make the connection. Lead the cables to the appropriate clips 
through the insulating bushing of the connection board.  

 

 

5. Connect the battery (mind the colours):   

           - battery output (+V):  BAT+ cable / red, 

- battery output (0V):  BAT 

– cable / GND / black. 

 
 
6. Connect the power (~230V). 
7. Connect the camera cables to the RJ45 connectors (PoE connectors) and connect the recorder to the network (the 
UPLINK connector). 
8. Connect the power supply of the DVR (by default, the device is equipped with a cable terminated with the DC 2,1/5,5 
plug). 
9. Check the optical indication of the switch operation. 
10. After installing and checking proper working, the enclosure can be closed.     

  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for S108-BR

Page 1: ...ime 3h 15min LED indication Metal enclosure color white RAL 9003 with space for two 17Ah 12V battery Supports auto learning and auto aging of MAC addresses 1K size warranty 2 year from the production date Example of use CONTENTS 1 Technical description 1 1 General description 1 2 Block diagram 1 3 Description of components and connectors 1 4 Technical parameters 2 Installation 2 1 Requirements 2 2...

Page 2: ...cription of how to perform the calculations can be found at Approximate backup time assumptions for calculations Automatic detection of any devices powered in the PoE PoE standard is enabled at the 1 8 ports of the switch The UpLink ports is used for connection of another network device e g recorder The LEDs at the front panel indicate the operation status description in the table 8 The switch is ...

Page 3: ...y unit 3 DC DC50SD converter 4 DC DC52230 converter 5 Output filter 6 Tamper micro switch terminals of tamper protection NC 7 Battery space for two 2 x 17Ah 12V connect the batteries in series 8 Power supply connector of the PSU L N PE protective connector electric shock 9 BAT BAT battery output BAT red BAT black 10 DVR power cord terminated with the DC 2 1 5 5 plug ...

Page 4: ...8 ports 52V DC 30W at each port Used pairs 4 5 7 8 Protocols Standards IEEE802 3 802 3u 802 3x CSMA CD TCP IP Bandwidth 1 6Gbps Transmission method Store and Forward Optical indication of operation Switch power supply Link Act PoE Status The given value of 30W per port is the maximum value The total power consumption should not exceed 120W when all PoE ports are being used Table 4 Electrical param...

Page 5: ...ossible Connectors Power supply of the cameras RJ45 socket Power supply for recorder DC2 1 5 5 plug Outputs Φ 0 63 2 50 AWG 22 10 Battery output BAT 6 3F 2 5 TAMPER output wires Notes The enclosure does not touch the assembly surface so that cables can be led Table 6 Operation safety Protection class EN 609501 2007 I first Protection grade EN 60529 2002 U IP20 Electrical strength of insulation bet...

Page 6: ...opriate fuse in the fuse box The electrical system shall follow valid standards and regulations 2 2 Installation procedure 1 Before installation cut off the voltage in the 230V power supply circuit 2 Mount the PSU in a selected location and connect the wires 3 Connect the power cables 230V AC to L N clips of the PSU The shock protection circuit shall be performed with a particular care i e the yel...

Page 7: ...3 1 LED indication of operating status The PSU is equipped with two diodes on the front panel RED LED on the PSU is supplied with 230V AC off no 230V AC supply GREEN LED on DC voltage in the AUX output of the PSU off no DC voltage in the AUX output of the PSU ...

Page 8: ...rload YELLOW LED LIGHT LINK The connection status of LAN devices 10 100 Mb s and data transmission OFF no connection ON the device is connected 10 100Mb s Blinking data transmission OPTICAL INDICATION AT THE UPLINK PORTS GREEN LED LIGHT Applies only to the right side port No light OFF No supply voltage of the switch ON the switch is powered correct operation YELLOW LED LIGHT LINK The connection st...

Page 9: ...arged battery disconnection system During the battery assisted operation reducing voltage below 19V at the battery terminals will cause battery disconnection 4 3 Maintenance Any and all maintenance operations may be performed following the disconnection of the PSU from the power supply network The PSU does not require performing any specific maintenance measures however in case of significant dust...

Page 10: ...ipment should be disposed of separately from normal household waste The power supply unit is adapted for a sealed lead acid battery SLA After the operation period it must not be disposed of but recycled according to the applicable law Pulsar Siedlec 150 32 744 Łapczyca Poland Tel 48 14 610 19 40 Fax 48 14 610 19 50 e mail biuro pulsar pl sales pulsar pl http www pulsar pl www zasilacze pl ...

Reviews: