background image

 

 

 

Installation example of the S108-CRB with batteries and the recorder 

(DVR and accumulators are not included) 

 
 

4.

 

Operation and use.

  

 

4.1

 

Overload or short circuit of the PSU output (SCP on).

  

In case of overload, the output voltage is automatically shut off, and so is the LED indicator. The restoration of the voltage 

takes place immediately after the failure (overload) is over.  

 

4.2

 

Disconnection of discharged battery

.  

The PSU is equipped with the discharged battery disconnection system. During the battery-assisted operation, reducing 

voltage below 19 V at the battery terminals will cause battery disconnection.  

 

4.3 Maintenance

.  

Any  and  all  maintenance  operations  may  be  performed  following  the  disconnection  of  the  PSU  from  the  power  supply 

network. The PSU   does not require performing any specific maintenance measures, however, in case of significant dust rate, 
its interior is recommended to be cleaned with compressed air. In case of fuse replacement, use a replacement of the same 
parameters.  

 

 

 

WEEE LABEL 

 

Waste electrical and electronic equipment must not be disposed of with normal household waste. 
According  to  the  European  Union  WEEE  Directive,  waste  electrical  and  electronic  equipment 

should be disposed of separately from normal household waste

 

 

The power supply unit is adapted for a sealed lead-acid battery (SLA). After the operation period it must not be disposed of but recycled according to the 

applicable law.

 

 

 

 
 
 

Pulsar sp. j. 

Siedlec 150,  32-

744 Łapczyca, Poland 

Tel. (+48) 14-610-19-40, Fax. (+48) 14-610-19-50 

e-mail

biuro@pulsar.pl

sales@pulsar.pl

 

http:// 

www.pulsar.pl

www.zasilacze.pl

 

 

 

Summary of Contents for S108-CRB

Page 1: ...space for two 17 Ah 12V battery and offers the possibility of recorder installation The enclosure construction is compliant with the requirements of the General Data Protection Regulation GDPR the possibility of installing two locks with different codes Space for a recorder with the following dimensions 380x320x65 WxHxD warranty 2 year from the production date Example of use CONTENTS 1 Technical d...

Page 2: ...es The electricity consumption for own needs and the energy efficiency of the power intake track were taken into account The exact description of how to perform the calculations can be found at Approximate backup time assumptions for calculations Automatic detection of any devices powered in the PoE PoE standard is enabled at the 1 8 ports of the switch The Up Link ports is used for connection of ...

Page 3: ... converter 4 DC DC50SD converter 5 Output filter 6 Tamper micro switch terminals of tamper protection NC 7 Battery space for two 2 x 17Ah 12V connect the batteries in series 8 Space for a recorder 380x320x65 WxHxD 9 Power supply connector of the PSU L N Protective connector electric shock 10 BAT BAT battery output BAT red BAT black 11 DVR power cord terminated with the DC 2 1 5 5 plug ...

Page 4: ...Transmission method Store and Forward Optical indication of operation Switch power supply Link Act PoE Status The given value of 30 W per port is the maximum value The total power consumption should not exceed 120 W Table 4 Electrical parameters Mains supply 200 240 V 50 Hz Current up to 1 3 A Supply power 208 W Output current at the PoE ports RJ45 8 x 0 6 A ΣI 2 3 A max Output voltage at the PoE ...

Page 5: ...n between input and output circuits of the PSU between input circuit and protection circuit between output circuit and protection circuit 3000 V AC min 1500 V AC min 500 V AC min Insulation resistance between input circuit and output or protection circuit 100 MΩ 500 V DC Declarations CE Table 7 Operating parameters Operating temperature 10ºC 40ºC Storage temperature 20ºC 60ºC Relative humidity 20 ...

Page 6: ...d connect the wires 2 Connect the power cables 230 V to L N clips of the PSU The shock protection circuit shall be performed with a particular care i e the yellow and green wire coat of the power cable shall stick to one side of the terminal marked with symbol on the PSU enclosure Operation of the PSU without the properly made and fully operational shock protection circuit is UNACCEPTABLE It can c...

Page 7: ...rts OFF no power supply at the RJ45 port the device is not connected or not compliant with the IEEE802 3af at standard ON supply at the RJ45 port Blinking short circuit or output overload YELLOW LED LIGHT LINK The connection status of LAN devices 10 100Mb s and data transmission OFF no connection ON the device is connected 10 100Mb s Blinking data transmission OPTICAL INDICATION AT THE UPLINK PORT...

Page 8: ...e disconnection of the PSU from the power supply network The PSU does not require performing any specific maintenance measures however in case of significant dust rate its interior is recommended to be cleaned with compressed air In case of fuse replacement use a replacement of the same parameters WEEE LABEL Waste electrical and electronic equipment must not be disposed of with normal household wa...