STEP 2: ATTACH HANDLE AND PEDAL ASSEMBLIES
For Handrail Assembly: Locate Left and Right Handlebars (3 L/R), Rotation Rod (37), 2x Small Hex
Screws (47), 2x Spring Washers (45), 1x Flat Washer (49), 2x D-Shape Washers (54), and 2x Wave
Washers (61)
For Connection Plate Assembly: Locate 2x Connection Plates (12), 2x M8x45 Bolts (34), 2x Small
Metal Bushings (41), 2x Flat Washers (42), and 2x M8 Nuts (43).
Note: The Hardware used to assembly the Rotation Rod may already be in the holes on either end of
the Rotation Rod (37). If located there, remove this hardware prior to performing Step A.
A.
Place the Rotation Rod through the horizontal hole in the front of the Main Frame above the Fan
Wheel.
1.
Assemble the LEFT Handlebar to the Rotation Rod with the hardware in the following order: First,
slide 1x Wave Washer (61) down on the rod against the hole housing on the Main Frame. Next, slide
the Left Handlebar (3L) onto the Rotation Rod. Then place: 1st: 1x D Washer (54), 2nd: 1x Flat Wash-
er (49), and 3rd: 1x Spring Washer (45). Secure with 1x Small Hex Screw (47).
2.
Assemble the RIGHT Handlebar to the Rotation Rod with its hardware in the same order.
IMPORTANT:
To fully tighten this Assembly to the Rotation Rod, you must use one Allen Key
to keep one Small Hex Screw (47) in place while you tighten the other.
B.
Once the Upper Hand Rails have been secured, Secure the Connection Plates (12) to each hand-
rail bottom. Take 1x M8 Bolt and first slide a Small Bushing with the larger end facing away from the
Bolt head onto the Bolt. Then, slide on a Flat Washer (42). Next, thread this Bolt assembly into the
small hole in the Connection Plate and through the hole on the bottom of the Handrail. Secure with 1x
M8 Nut (43).
C.
Repeat the above steps to attach the Right Connection Plate.
Meijer.com