8
PIPE LAYOUT
7
.
Please lay the pipeline strictly according to the requirement of manual. Seal the
interface and makes it airproof, water proof, keep the pipeline smoothly, preventing
leakage in the pipeline.
In order to prevent spray outlet having its water falling back, the spray holes should be
pointing 30 degree upward above the horizontal of the PVC cross-section. The
diameter of hole need to be 1.5cm, the distance between the holes should be
80cm~200cm and it should be with the principle of higher vapor density in near
distance and scattered in far distance, the height at the end need to be higher than the
humidifying section, please check the sketch(5), can not connect the water pipe such as
sketch(6) with rough pipe.
Note: If there is no need to lay the pipeline, you must install spray outlet pipe
and connect to a lose elbow so as to adjust the direction of spray freely, check
the sketch 6. The shortest distance of elbow should above 20cm from the
machine, otherwise, the water would drop on the any parts of the machine
and it would lead to rust, or short circuit or cause accident. It is suggested to
separate the equipment and the site, use the pipe to humidify the room.
Summary of Contents for PD ZS-10Z
Page 1: ...INSTRUCTION MANUAL ULTRASONIC AIR HUMIDIFIER PD ZS 10Z ...
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......