18
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2020
Maintenance Procedure
Quartz Sleeve Maintenance/Replacement Procedure
To ensure high sterilising rate with best water quality, check sleeve regularly (about
every 3 months depending on quality of water source) and see whether there is dirt
or substances gathered. Allow the unit to cool before servicing. Prior to performing
any work on the UV sterilizer, always disconnect the power supply.
1. Turn off the power and water to the unit and
release the water pressure (using the red
buttons above the unit's filters).
Parts become hot during operation.
Allow to cool before servicing.
2. Unlock and open the cover if you have a
Hybrid G. To disconnect the Lamp Connector,
detach the earthing wire, grip the white Cap and
carefully disconnect from the Aluminium Nut.
3. Slowly remove the UV Lamp from the chamber.
4. Unscrew and remove the Aluminium Nut on the
top of the chamber. Now remove the Aluminium
Nut from the bottom of theStainless Steel
Chamber, securing the Spring and Quartz Sleeve.
Important:
Be aware that the water within in
the chamber will be discharged through the
bottom of the Stainless Steel Chamber once the
bottom Aluminium Nut is removed.
Important:
The Quartz Sleeve may come
through the base of the chamber after the bottom Aluminium Nut
is removed, hold the bottom of the Quartz Sleeve and remove the bottom O-Ring.
cont. over page.
valve
IN
OUT
4
5
7
8
Replacing UV Lamp
valve
IN
3
Cleaning Quartz Sleeve
1
2
3
valve
IN
OUT
10
mins
4
5
6
Replacing UV Lamp
7
8
9
Replacing UV Lamp
IN
OUT
1
2
4
5
O Ring
O Ring
Cleaning Quartz Sleeve
1
2
3
valve
IN
OUT
10
mins
4
5
6
Replacing UV Lamp
7
8
9
Replacing UV Lamp
1
2
4
5
O Ring
7
8
Replacing UV Lamp
valve
IN
OUT
3
O Ring
Cleaning Quartz Sleeve
1
2
3
4
5
O Ring
4
5
6
7
8
Replacing UV Lamp
valve
IN
OUT
3
O Ring
Fig. 7
Summary of Contents for HYBRID G12
Page 24: ......