14
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2020
Installation Procedure
Programming
6.1 Plug into an uninterrupted electrical outlet.
Note: All electrical connections must be connected accordingly to local codes.
6.2 Proceed to ‘Programming’ section
12
Connecting the Overflow
11
Connect tubing onto the 5/8” overflow
fitting (tubing not supplied) and run the
line to the drain.
Do not connect the
overflow into the drain line
, as it must
be a direct and separate line to the
drain. Allow an air gap as per the drain
line. Make sure the drain is not higher
than the overflow.
Overflow
Brine
Summary of Contents for SOL-TA Series
Page 32: ......