Installation Guide / PostMount 3-A for XL Panels
6
Code-Compliant Planning and Installation Guide V 1.1 - Complying with AS/NZS1170.2-2011 ADMT 4-2016
- Installation Instruction -
Installation Instruction
Dig a hole with the diameter of 300mm .
Place the pole into the middle of the hole and fill it with concrete
(min 25 MPa strength). Maintain the position of the post. The allowed
vertical tolerance is ±2°.Keep the axle of the 2- Ø16 holes parallel to
East-West;keep the vertical angle deviation within ±5°.For more than
one system on one site maintain all the axles of 2- Ø16 holes aligned.
Connect the Pipe to the corrugated washer and Steel Cap Assembly with M14*150 hexagonal bolt, plain washer 14,
spring washer 14, M14 nut .
Combine two Steel Caps with M14*110 hexagonal bolt, plain washer 14, spring washer 14, M14 hex nut.
Note:
1. Do not fasten the Bolt prior to complete the assembly of PM-A Rectangular Tube-Master.
2. Keep all the Bolt head aligned.
1. Pipe Installation
2. Steel Cap Installation