Sigma Operation Manual
Revision B
/
July 2020
Page 14 of 68
Power Up
After the accessories are installed, connect the workcell to air and power supplies. After
the workcell is correctly connected, turn the main power switch “On” and make sure
system components function correctly.
WARNING: Failure to obey electrical specifications can damage the machine and
injure personnel. Electrical hookup must be done by a qualified electrician and must
comply with any applicable local standards.
1.
Plug the machine into an appropriate power source as shown on the legend plate on
the right side of the machine.
The electrical service must be correctly grounded and the power source “clean”. If high-
power equipment uses the same source, a line conditioner may be necessary. Poor power
quality can cause machine errors. All workcells shipped from the PVA factory can operate
with the voltage used at the installation site, per engineering design.
WARNING: Make sure that the main power switch is “Off” before you connect the
workcell to the facility power source.
2.
Find the main air regulator.
3.
Attach the workcell to the facility air supply. There is a ¼” NPT female fitting at the
rear of the machine. Connect to a source of clean, dry air. A hose of ¼” inside
diameter is sufficient.
4.
Slowly open the facility air valve.
5.
Close any access doors and engage in the Emergency Stop button.
6.
At the top of the machine, turn on the red air lockout valve.
Figure 2: Red Air Lockout Valve