CLEANING ELECTRIC ELEMENTS 
 

Electric immersion INCOLOY® sheath elements are wound at high wattage ratings and must be completely covered by 
water while in operation. Otherwise, they overheat and burn out. Scale from the water will collect on the sheathing of the 
element over a period of time and must be removed periodically to extend the life of the element. Water in some areas will 
produce the scale buildup more rapidly than other areas. The rapidity of the scale buildup is also determined by the watt 
density of the element.  
 
It is good maintenance practice to remove and clean 80 W/in² (18kW) density elements on a monthly basis. The interval 
between removal and cleaning can usually be extended to six months when 40 W/in² (9kW) density elements are 
installed. Most installations where 20 W/in² (4 1/2kW) density elements are used, require only annual cleaning. Elements 
are cleaned by soaking in a scale dissolving solution. A 30” piece of four or six inch PVC pipe with a cap on one end 
makes an ideal container for element cleaning. (See figure 5.) Contact a chemical supply house for advice on the proper 
cleaning solution for your area.  

 
 
 

Element Cleaner 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FIGURE 5 

 

 

Summary of Contents for 500-6

Page 1: ...t perform installation and service WARNING Do not use this appliance if any part has been under water Immediately call a qualified service technician to inspect the unit and to replace any part of the control system and any other items affecting safe appliance operation Failure to follow these instructions can cause property damage personal injury or loss of life TO THE INSTALLER After installatio...

Page 2: ...DURAWATT ELECTRIC WATER HEATER PV500 6 09 07 2 TYPICAL CONSTRUCTION FIGURE 1 Without 23 Diameter Tank Access FIGURE 2 With 23 Diameter Tank Access ...

Page 3: ...THE PHYSICALLY HANDICAPPED HOSPITALS AND NURSING HOMES ELDER CARE FACILITIES AND REST HOMES ORPHANAGES AND CHILD CARE FACILITIES OTHER INSTALLATIONS WHERE RESPONSE TO CONTACT WITH HOT WATER MAY BE SLOWER OR WHERE THE DANGER OF HOT WATER CONTACT IS GREATER Thermostatically controlled mixing valves must be used in the design of the potable hot water system Potable hot water should be tempered to no ...

Page 4: ... 3 Locate the foundation on a pitched floor near a suitable drain or make other provisions to prevent contact to areas of the building subject to water damage should the boiler or a water connection leak The drain must be sufficient to contain water in excess of 210 F INSTALLATION WARNING Use industry standard safe rigging methods when attempting to lift or move this product Failure to follow thes...

Page 5: ...MPORTANT Check all wiring connections in heater and element enclosure to assure tightness prior to energizing NOTE Use only copper wire of proper sizing for incoming service Damage resulting from use of aluminum wiring is excluded from coverage under the warranty of this unit ELECTRONIC LOW WATER CUTOFF The device consists of a probe in the tank that acts as a switch closed when submerged in water...

Page 6: ...e elements have 3 terminals 1 phase elements have 6 terminals FIGURE 3 2 Check all electrical connections for tightness before turning the unit on 3 Energize manual disconnect switch Check for proper voltage with voltmeter on power circuit Voltage should not vary more than 5 from voltage shown on data plate If voltage exceeds these limits immediately turn off main disconnect and contact utility co...

Page 7: ...proper performance MAINTENANCE A preventative maintenance program is required to ensure a long trouble free life of the water heater Maintenance Schedule COMPONENT OPERATION INTERVAL REQUIRED Tank Sediment Removal Every 3 Months Flushing Relief Valve Inspect Every 6 Months Test Electrical Connections Inspect Monthly Inspect for wire discoloration Electric Elements Check Every 6 Months Amp Draw Ele...

Page 8: ...ief valve mounting location Low Water Cut Off The standard low water control is electronic Inspection should be made of the electrode on water heaters equipped with electronic low water devices Electrical Connections Check all electrical connections approximately one to two weeks after initial start up to assure tightness Heating and cooling from operation can loosen connections Visually inspect w...

Page 9: ...of the scale buildup is also determined by the watt density of the element It is good maintenance practice to remove and clean 80 W in 18kW density elements on a monthly basis The interval between removal and cleaning can usually be extended to six months when 40 W in 9kW density elements are installed Most installations where 20 W in 4 1 2kW density elements are used require only annual cleaning ...

Page 10: ... READING MAY VARY FROM ZERO DIRECT SHORT TO SEVERAL HUNDRED OHMS PARTIAL SHORT IN ANY CASE WHERE THE OHM READING IS NOT INFINITY THE ELEMENT SHOULD BE REPLACED B C 26 39 39 C A 26 39 18 240 A B 7 20 B C 7 10 10 C A 7 10 18 208 A B 5 15 B C 5 7 5 7 5 C A 5 7 5 9 480 A B 51 153 B C 51 76 5 76 5 C A 51 76 5 9 240 A B 13 39 B C 13 19 5 19 5 C A 13 19 5 9 208 A B 10 30 B C 10 15 15 C A 10 15 4 5 480 A ...

Page 11: ...DURAWATT ELECTRIC WATER HEATER PV500 6 09 07 11 FIGURE 7 FIGURE 6 TYPICAL WIRE TERMINATIONS FIGURE 8 TYPICAL SINGLE PHASE WIRING TYPICAL THREE PHASE WIRING FIGURE 10 FIGURE 9 ...

Page 12: ...efore the 40W in 2 is rated for 14 kW instead of 9 kW KW VOLTAGE 3 Ø AMPS PER ELEMENT 1 Ø AMPS PER ELEMENT AMPS PER LEG AMPS TOTAL AMPS PER LEG AMPS TOTAL 14 kW 600V 13 1 2 13 1 2 7 kW 600V 7 7 18 kW 480V 22 22 9 kW 480V 11 11 4 5 kW 480V 5 1 2 5 1 2 18 kW 240V 44 44 25 75 9 kW 240V 22 22 13 38 4 5 kW 240V 11 11 6 18 18 kW 208V 50 50 29 87 9 kW 208V 25 25 15 44 4 5 kW 208V 12 1 2 12 1 2 7 22 TABLE...

Page 13: ...ecial fasteners with similar grade 8 bolts washers and nuts Install the flange bolts and nuts with a flat washer under each bolt head and nut First snug them in an alternating star pattern Then using a calibrated torque wrench and in an alternating star pattern tighten the bolts in 2 increments 95 ft lbs and 145 ft lbs Use a small amount of silicone RTV to hold the o ring in place while positionin...

Page 14: ...put Consult local PVI representative Hot water lines not insulated Add insulation it will protect against heat loss and save on cost of operation Power fuse s blown Check fuses for continuity Replace if blown If blown determine cause of break before replacing with same type fuse Contractor s not closing Check coil for continuity If defective replace Thermostat s not correctly set Check to assure p...