4-in-1 IRD User
’s Manual
6 / 38
Chapter 2 Installation Guide
2.1 Acquisition Check
When user opens the package of the device, it is necessary to check items according
to packing list. Normally it should include the following items:
MTRX 4-in-1 IRD 1pcs
Power Cord 1pcs
If any item is missing or mismatching with the list above, please contact our company.
2.2 Installation Preparation
When users install device, please follow the below steps. The details of installation
will be described at the rest part of this chapter. Users can also refer rear panel chart
during the installation.
The main content of this chapter including:
Checking the possible device missing or damage during the transportation
Preparing relevant environment for installation
Installing modulator
Connecting signal cables
Connecting communication port (if it is necessary)
2.2.1 Device's Installation Flow Chart Illustrated as following
:
Connecting
Grouding
Wire and
Power
Cord
Acquisition
Check
Fixing
Device
Setting
Parameter
Running
Device
Connecting
Signal Wire
2.2.2 Environment Requirement
Summary of Contents for MTRX
Page 4: ...2 38 1 3 Specifications ...