www.PyleUSA.com
3
INSTALLATION PROCEDURE
1. Open the carton and find the square hole at both end of the polyfoam.
Take out the corner connector, hanging kit, Alan head screws, wrench,
and springs.
2. Lay the longer frame and shorter frame on a neat and soft ground. Place
the L-shape corner connector in the groove of both frames and join the
two frames together by the corner connector. Make sure the direction of
frame and connectors is correct. Drive the screws into the hole of
connectors and make sure the frames are joined in a right angle and
good tightness.
3. Stretch the screen and put the fiber glass tube respectively according to
the length. Stretch the screen after the tubes are placed correctly. Put the
screen in vertical direction and make sure the screen is centered in the
frame. Use the spring hook to connect the hole on the frame and the
hole on the screen. Remember to work the springs hook on the four
corner of the frame first before you work on hooks elsewhere. (smaller
hook of the spring for the frame and the bigger hook for screen.)
Summary of Contents for PRJTPFL102
Page 6: ......