4
5
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.3_G11.7 – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.3_G11.7 – Q CELLS
Validity
These instructions are only valid for crystalline solar modules from
the company Q CELLS as specified at chapter „2.1 Technical
Specifications“. Q CELLS assumes no liability for damage resulting
from failure to observe these instructions.
Ä
Please observe the wiring and dimensioning of the system.
Ä
The installer of the system is responsible for compliance with all
necessary safety regulations during set-up and installation.
Q CELLS assumes no liability on the basis of these instructions.
Q CELLS is only liable in the context of contractual agreements
or in the context of accepted guarantees. Q CELLS accepts no
other responsibility for the functionality and safety of the modules.
Ä
Please observe the instructions for any other system compo-
nents that may be part of the complete solar power system.
It may be necessary to carry out a structural analysis for the
entire project.
Ä
If your questions are not satisfactorily answered in the manual,
please contact your system supplier.
Additional information for the Operator
Ä
Please keep this manual for the entire life of the solar power
system.
Ä
Please contact your system supplier for information concerning
the formal requirements for solar power systems.
Ä
Please be sure to contact the relevant local authorities and
energy providers regarding regulations and permit requirements
prior to installation of the solar power system. Your financial
success depends on the fulfillment of these requirements.
Other applicable documents
In addition to this Manual following technical information are
relevant:
DOCUMENT TYPE
Product data sheet
Packaging and transport information
MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS
THE LIMITED WARRANTY AND MAY CREATE A SAFETY
HAZARD AND RISK PROPERTY DAMAGE. THIS INCLUDES
IMPROPER INSTALLATION OR CONFIGURATION, IMPROPER
MAINTENANCE, UNINTENDED USE, AND UNAUTHORIZED
MODIFICATION.
Fig. 1:
External dimensions (in mm) and components
for Q.PEAK DUO XL-G11.3 and
Q.PEAK DUO XL-G11.7
NA
44.7"
(1134 mm)
55.1" (1400 mm)
95.1" (2416 mm)
1.38" (35 mm)
4 × Mounting slots (DETAIL A)
Frame
43.0"
(1092 mm)
20.0" (508 mm)
Label
4 × Grounding holes, Ø 0.18" (4.5 mm)
4 × Drainage holes
15.7" (400 mm)
8 × Mounting slots system Tracker (DETAIL B)
DETAIL A
0.63" (16 mm)
0.33" (8.5 mm)
0.83" (21
mm)
DETAIL B
0.39" (10 mm)
0.28" (7 mm)
0.87" (22
mm)
42.1"
(1090 mm)
31.1" (790 mm)
≥ 29.5" (750
mm)
4 × Drainage holes
0.11 × 0.24" (2.8 × 6 mm)
4 × Drainage holes
0.12 × 0.24" (3 × 6 mm)
For additional information see the relevant datasheet of the module provided at www.q-cells.com.
PRODUCT LINE
Q.PEAK DUO XL-G11.3
Q.PEAK DUO XL-G11.7
Type
Q.ANTUM DUO Z
Length
2416 mm
Width
1134 mm
Frame height
35 mm
Area
2.74 m²
Weight
30.7 kg
Max. system voltage V
SYS
1500 V (IEC) / 1500 V (UL)
Max. reverse current
25 A
Permissible temperature range
–40 °C to +85 °C (–40 °F to +185 °F)
Junction box protection class
≥ IP67 with bypass diode
Connector protection class
IP67 or IP68
Fire rating
C
Max. test load Push / Pull
1
5,400 Pa / 2,400 Pa
Max. design load Push / Pull
1
3,600 Pa / 1,600 Pa
Middle rail
No
Certificates
Quality Controlled PV by TÜV Rheinland; CE-compliant; IEC 61215:2016; IEC
61730:2016; PV module classification: Class II; QCPV Certification ongoing.
1
Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)
1 INTRODUCTION
2 PLANNING
2.1 TECHNICAL SPECIFICATIONS