INSTALLATION AND OPERATION MANUAL FOR FLAT ROOF SYSTEM Q.FLAT-G6 – Q CELLS
The amount of additional weighting of the system depends on many parameters such as building height, location, environment,
type of roofing and many more.
NOTE:
The positioning of the ballast blocks must be carried out as described in the current project report.
4
ASSEMBLY
4.5 OPTIONAL STEP
4.5.2 BALLAST BLOCK O
5
INFO
i
PRELIMINARY WORK:
Î
Fit the cross brace and ballast brace
F
to both towers
E
as described in step 4.4.
PROCEDURE:
Î
Place ballast blocks
O
5
evenly distributed on the cross braces and ballast braces
F
.
•
Maximum weight per ballast brace arrangement: 135 kg
The position of the ballasting must always be carried out strictly in accordance with the current project report. A different distribution
or the omission of ballast elements can impair the positional safety of the entire installation and represent an enormous risk. Devi-
ations from the project report must be agreed with Q CELLS and only carried out after written approval. The position of the ballast
elements must be selected in such a way that slipping down, tilting or wobbling is permanently prevented. The ballast elements
must rest on the entire surface; leaning against them is not sufficient. In addition, it is possible to secure the ballast against tipping
or slipping by means of ballast clamps. The current project report shows whether and which ballast blocks are to be secured with
the help of ballast clamps.