INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.X – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.X – Q CELLS
Installation Site
Please note the following guidelines that apply to the installation site:
•
Solar modules are not explosion-proof and are not suitable for
use in explosive environments.
Ä
Do not operate solar modules near highly flammable gas and
vapors (e.g. gas tanks, gas stations).
Ä
Do not install modules in enclosed space.
Ä
Do not install modules in locations where they may be submerged
in water (e.g. floodplains).
Ä
Do not use modules as a substitute for the normal roofing (e.g.
modules are not watertight).
Ä
Do not install modules in close proximity to air conditioning
systems.
Ä
Do not install modules above 13,120 ft (4,000 m) altitude above
sea level.
Ä
Contact with saline water (e.g. spray water from the sea) and
salt aggregation on the modules must be avoided.
Ä
Do not bring any chemical substance (e.g. oil, solvent etc.) into
contact with any part of the panel. Only substances, which are
released by Q CELLS, are allowed to be used during installation,
operation and maintenance.
Ä
Any installation of modules on surfaces of water is prohibited.
This includes installations on floating as well as pile-based
platforms. Q CELLS may extend the coverage of its warranty
to such installations, based on a case by case assessment of
the system design and location. A prior written consent by the
warrantor is required in any case.
Prevention of Shadowing Effects
Optimal solar irradiation leads to maximum energy output:
Ä
For this reason, install the modules so that they face the sun.
Ä
Avoid shadowing (due to objects such as buildings, chimneys
or trees).
Ä
Avoid partial shading (for example through overhead lines,
dirt, snow).
Limitations
The solar modules are designed for the following applications:
•
Operating temperatures from –40 °F to +185 °F.
•
Pull loads and push loads according to chapter 2.3 (‘Test Load’
in accordance with IEC 61215 and ‘Design Load ×1.5’ in accor-
dance with UL 61730).
•
Installation using a mounting structure for solar modules.
Mounting Structure Requirements
Requirements for the mounting structure:
•
Conform to the necessary structural requirements.
•
Compliant with local snow and wind loads.
•
Properly fastened to the ground, the roof, or the façade.
•
Forces acting on the module are relayed to the mounting sub-
structure.
•
Ensures sufficient rear ventilation of the module.
•
Avoid the usage of different metals to prevent contact corrosion.
•
Allows for stress-free expansion and contraction due to tem-
perature fluctuations.
Ä
Ensure that no additional forces are applied through the mounting
system into the module except for the wind and snow loads.
Additional forces and moments of torque at the mounting
positions caused by torsions, displacements or vibrations in
the mounting system are not allowed.
Ä
Ensure that the clamps and the mounting frame are compatible.
Clamp System Recommendations
Use customary clamps that satisfy the following requirements:
•
Clamp width: ≥ 1.5 in (38 mm).
•
Clamp height compliant with a 1.26 in (32 mm) frame height.
•
Clamp depth: 0.28-0.47 in (7-12 mm). (applicable for all CL
clamping mounting options at section „2.3 Mounting Options“)
•
Clamps are not in contact with the front glass.
•
Clamps do not deform the frame.
•
Clamps that satisfy the structural requirements based on the
conditions of the installation site according to the applicable
regulations and technical standards.
•
Long-term stable clamps that securely affix the module to the
mounting frame.
Module Orientation Requirements
•
Vertical or horizontal installation is permitted.
Ä
Ensure that rain and melting snow can run off freely. No water
accumulation.
Ä
Ensure that the drainage holes in the frame are not covered.
No sealing.
75°
3°
Ä
Maintain the permissible angle of inclination.
•
Minimum angle of inclination: 3°
•
Inclination angles above 75° may be limited by
local regulations
Ä
Standing water on the modules glass needs to be
avoided.
2 PLANNING
2.2 REQUIREMENTS
Fig. 2:
Installation options for crystalline Q CELLS modules. All dimensions are given in inch (mm in brackets). Also observe
the maximum test loads and clamping range as specified on the following page.
The illustrated installation options apply for both horizontal and vertical module orientation.
Module
Clamp
Subconstruction
Mounting profile
TYPE OF
INSTALLATION
MODULE
POINT MOUNTING SYSTEM
LINEAR MOUNTING SYSTEM
INSTALLATION
WITH CLAMPS
Q.PEAK DUO ML-G9
Q.PEAK DUO ML-G9+
Q.PEAK DUO BLK ML-G9
Q.PEAK DUO BLK ML-G9+
HYBRID
CLAMPING
Q.PEAK DUO ML-G9
Q.PEAK DUO ML-G9+
Q.PEAK DUO BLK ML-G9
Q.PEAK DUO BLK ML-G9+
INSTALLATION
ON MOUNTING
POINTS
Q.PEAK DUO ML-G9
Q.PEAK DUO ML-G9+
Q.PEAK DUO BLK ML-G9
Q.PEAK DUO BLK ML-G9+
INSTALLATION
WITH INSERTION
PROFILES
Q.PEAK DUO ML-G9
Q.PEAK DUO ML-G9+
Q.PEAK DUO BLK ML-G9
Q.PEAK DUO BLK ML-G9+
NOT PERMITTED
2 PLANNING
2.3 MOUNTING OPTIONS
IP1
IP2
IP1
IP2
IP1
IP2
IP1
IP2
11.8 - 17.7
(300 - 450)
NA
3.94 - 9.84
(100 - 250)
CL5
28.4 - 44.1
(720 - 1120)
NA
3.94 - 9.84
(100 - 250)
CL6b
720 - 1120
150 - 350
CL6a
CL2a
0.79 - 11.8
(20 - 300)
CL2b
0.79 - 11.8
(20 - 300)
CL2a
0.79 - 11.8
(20 - 300)
CL2b
0.79 - 11.8
(20 - 300)
0.79 - 21.7
(20 - 550)
5.91 - 17.7
(150 - 450)
North
America
0.79 - 21.7
(20 - 550)
CL1a
CL1b
0.59 - 8.27
(15 - 210)
0.79 - 21.7
(20 - 550)
5.91 - 17.7
(150 - 450)
North
America
0.79 - 21.7
(20 - 550)
CL1a
CL1b
0.59 - 8.27
(15 - 210)
CL3
CL4
0 - 11.8
(0 - 300)
9.84 - 17.7
(250 - 450)
7.87 - 13.8
(200 - 350)
North
America
CL3
CL4
0 - 11.8
(0 - 300)
NA
4 × mounting
slots
14.8
(376)
FB2
4 x mounting
slots
NA
14.8
(376)
FB1