background image

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11S.X / BFG

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11S.X / BFG

10

11

Mounting options with bolts

The illustrated installation options apply for both horizontal and vertical module orientation.

Module

        

  Bolt

Mounting rail

4 BOLTS/SCREWS ON LONG SIDE & 

2 CONTINUOUS RAILS PARALLEL TO SHORT SIDE

4 BOLTS / SCREWS ON LONG SIDE & 

2 CONTINUOUS RAILS UNDERNEATH LONG FRAME PARTS 

FB1

L

FB2

L

POSITION OF 
BOLTS* [in]

TEST LOAD 
PUSH / PULL [Pa]

DESIGN LOAD 
PUSH / PULL [Pa]

POSITION OF 
BOLTS* [in]

TEST LOAD 
PUSH / PULL [Pa]

DESIGN LOAD 
PUSH / PULL [Pa]

L

20.9 (531 mm)

5400 / 2400

3600 / 1600

L

20.9 (531 mm)

3600 / 2400

2400 / 1600

FB1

  This mounting option is not recommended as mounting rails will cast shade on the module rear side. 

FB1, FB2

  Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the 

module and substructure).

  Use M8 corrosion-proof screws and washers (diameter ≥ 0.62 in (15.8 mm)) for mounting slots (Detail A, Fig.1) 

and M6 corrosion-proof screws and washers or bobtails for tracker slots (diameter ≥ 0.51 in (13 mm); Detail B, 
Fig. 1). Mounting screws and washers should have the same material properties.

4 BOLTS/SCREWS ON LONG SIDE & 

2 CONTINUOUS RAILS UNDERNEATH LONG FRAME PARTS

mFB2

L

POSITION OF 
BOLTS* [in]

TEST LOAD 
PUSH / PULL [Pa]

DESIGN LOAD 
PUSH / PULL [Pa]

L

20.9 (531 mm)

2700 / 2400

1800 / 1600

mFB2

  Mounting rails need to extend beyond the middle of mounting holes by at least 0.79 in (20 mm). Clamps 

must not extend beyond the mounting rails.

  Use M8 corrosion-proof screws and washers (diameter ≥ 0.62 in (15.8 mm)) for mounting slots (Detail A, Fig.1) 

and M6 corrosion-proof screws and washers or bobtails for tracker slots (diameter ≥ 0.51 in (13 mm); Detail B, 
Fig. 1). Mounting screws and washers should have the same material properties.

*

Distance between outer edge of module and middle of the clamp.

2  Planning

2.3 Mounting options

Tracker mounting options

Module

        

  Bolt

   Mounting rail

TRACKER INSTALLATION USING 15.7in(400 mm) HOLES

TB1a

L

Torque tube 

TB2a

L1

L2

Torque tube 

POSITION OF 
BOLTS* [in]

TEST LOAD 
PUSH / PULL [Pa]

DESIGN LOAD 
PUSH / PULL [Pa]

POSITION OF 
BOLTS* [in]

TEST LOAD 
PUSH / PULL [Pa]

DESIGN LOAD 
PUSH / PULL [Pa]

L

40.6 (1031 mm)

1600 / 1600

1060 / 1060

L1

outer side:
40.6 (1031 mm)

2100 / 1800

1400 / 1200

L2

inner side:
20.9 or 32.9 or
40.6
(531 or 836 or
1031 mm)

TB2a

  Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the 

module and substructure). 

  Mounting rails need to extend beyond the middle of mounting holes by at least 0.7 in (17 mm).

TB1a, TB2a

  Use M8 corrosion-proof screws and washers (diameter ≥ 0.62 in (15.8 mm)) for mounting slots (Detail A, 

Fig.1) and M6 corrosion-proof screws and washers or bobtails for tracker slots (diameter ≥ 0.51 in (13 mm); 
Detail B, Fig. 1). Mounting screws and washers should have the same material properties.

TRACKER INSTALLATION USING 31.1in(790mm) HOLES

TB1b

L

Torque tube 

TB2b

L1

L2

Torque tube 

POSITION OF 
BOLTS* [in]

TEST LOAD 
PUSH / PULL [Pa]

DESIGN LOAD 
PUSH / PULL [Pa]

POSITION OF 
BOLTS* [in]

TEST LOAD 
PUSH / PULL [Pa]

DESIGN LOAD 
PUSH / PULL [Pa]

L

32.9 (836 mm)

2600 / 2300

1700 / 1500

L1

outer side:
32.9 (836 mm)

2600 / 2300

1730 / 1530

L2

inner side:
20.9 or 32.9
(531 or 836 mm)

TB2b

  Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the 

module and substructure).

 Mounting rails need to extend beyond the middle of mounting holes by at least 0.7 in (17 mm).

TB1b, TB2b

  Use M8 corrosion-proof screws and washers (diameter ≥ 0.62 in (15.8 mm)) for mounting slots (Detail A, 

Fig.1) and M6 corrosion-proof screws and washers or bobtails for tracker slots (diameter ≥ 0.51 in (13 mm); 
Detail B, Fig. 1). Mounting screws and washers should have the same material properties.

*

Distance between outer edge of module and middle of the clamp.

Summary of Contents for Q.PEAK DUO XL-G11S /BFG Series

Page 1: ...Installation and operation manual Q PEAK DUO XL G11S X BFG solar module series...

Page 2: ...ator are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation an...

Page 3: ...AGE THIS INCLUDES IMPROPER IN STALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION Attention This marking indicates that this product should not be disposed of...

Page 4: ...Installation using a mounting structure for solar modules Mounting Structure Requirements Requirements for the mounting structure Conform to the necessary structural requirements Compliant with local...

Page 5: ...sult from the safety factor 1 5 Mounting options with clamps The illustrated installation options apply for both horizontal and vertical module orientation Module Clamp Mounting rail 4 CLAMPS ON LONG...

Page 6: ...same material properties Distance between outer edge of module and middle of the clamp 2 Planning 2 3 Mounting options Tracker mounting options Module Bolt Mounting rail TRACKER INSTALLATION USING 15...

Page 7: ...clear ance between the bottom module plane level of bottom frame leg and closest substructure element below solar module lam inate The minimum clearance is defined by the maximum test push load and t...

Page 8: ...gulations when designing the system It has to be ensured that the maximum system voltage including all necessary safety margins is not exceeded Take the voltage limit of the inverter into account when...

Page 9: ...connection cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any ob...

Page 10: ...out work on the inverter and the wiring with extreme cau tion Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the invert...

Page 11: ...ectrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of...

Page 12: ...n inches 0 1 7 7 0 0 0 8 0 0 08 0 79 0 47 0 08 Option A Use of a grounding lug A listed grounding lug can be bonded to the frame using the grounding holes pre drilled in the frame These holes are mark...

Page 13: ...installation area alone or without taking ade quate security precautions Please commission a trade specialist NOTE Module surface damage may occur Remove snow and ice carefully without force e g with...

Page 14: ...nstallation manual solar modules Q PEAK DUO XL G11S X BFG_modules_series_2023 10_Rev05_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL hqc inquiry...

Reviews: