INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.3 / BFG AND XL-G9.3 / BGT – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.3 / BFG AND XL-G9.3 / BGT– Q CELLS
Validity
These instructions are only valid for crystalline solar modules from
the company Q CELLS as specified at chapter „2.1 Technical
Specifications“. Q CELLS assumes no liability for damage resulting
from failure to observe these instructions.
Ä
Please observe the wiring and dimensioning of the system.
Ä
The installer of the system is responsible for compliance with all
necessary safety regulations during set-up and installation.
Q CELLS assumes no liability on the basis of these instructions.
Q CELLS is only liable in the context of contractual agreements
or in the context of accepted guarantees. Q CELLS accepts no
other responsibility for the functionality and safety of the modules.
Ä
Please observe the instructions for any other system compo-
nents that may be part of the complete solar power system.
It may be necessary to carry out a structural analysis for the
entire project.
Ä
If your questions are not satisfactorily answered in the manual,
please contact your system supplier.
Additional information can be found on our website at
www.q-cells.us.
Information for the Operator
Ä
Please keep this installation manual for the entire life of the
solar power system.
Ä
Please contact your system supplier for information concerning
the formal requirements for solar power systems.
Ä
Please be sure to contact the relevant local authorities and
energy providers regarding regulations and permit requirements
prior to installation of the solar power system. Your financial
success depends on the fulfillment of these requirements.
Other applicable documents
This installation manual is only valid in combination with the following
technical information.
DOCUMENT TYPE
Product data sheet
Packaging and transport information
MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE
LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD
AND RISK PROPERTY DAMAGE. THIS INCLUDES IMPROPER
INSTALLATION OR CONFIGURATION, IM PROPER MAINTENANCE,
UNINTENDED USE, AND UNAUTHORIZED MODIFICATION.
Fig. 1:
External dimensions (in inch (mm)) and components for
Q.PEAK DUO XL-G9.3 / BFG and Q.PEAK DUO XL-G9.3 / BGT
40.6"
(1030 mm)
51.5" (1308 mm)
85.2" (2163 mm)
1.38" (35 mm)
4 × Mounting slots (DETAIL A)
8 × Drainage holes
0.12 × 0.24" (3 × 6 mm)
Frame
38.9"
(988 mm)
16.8" (427.5 mm)
Label
4 × Grounding holes,
Ø 0.18" (4.5 mm)
15.7" (400 mm)
8 × Mounting slots system Tracker (DETAIL B)
DETAIL A
0.63" (16 mm)
0.33" (8.5 mm)
0.82" (21
mm)
DETAIL B
0.39" (10 mm)
0.28" (7 mm)
0.86" (22
mm)
38.8"
(986 mm)
31.2" (790 mm)
≥ 27.6" (700
mm)
≥ 13.8" (350
mm)
For additional information see the relevant datasheet of the module provided at www.q-cells.us.
PRODUCT LINE
Q.PEAK DUO XL-G9.3 / BFG
Q.PEAK DUO XL-G9.3 / BGT
Type
Q.ANTUM DUO
Length [in]
85.2 (2163 mm)
Width [in]
40.6 (1030 mm)
Frame height [in]
1.38 (35 mm)
Area [yd²]
2.67 (2.23 m²)
Weight [lbs]
63.27 (28.7 kg)
Max. system voltage V
SYS
1500 V (IEC) / 1500 V (UL)
Max. series fuse rating
20 A
Permissible temperature range
–40 °F to +185 °F (–40 °C to +85 °C)
Junction box protection class
≥ IP67 with bypass diode
Connector protection class
IP67 or IP68
Fire rating based on ANSI / UL 61730
C / TYPE 29 (New Type is similar to Type 3 but with metallic frame)
Max. test load Push/Pull
1
[lbs/ft²]
75 / 63 (3,600 Pa / 3,000 Pa)
Max. design load Push/Pull
1
[lbs/ft²]
50 / 42 (2,400 Pa / 2,000 Pa)
Middle rail
No
Certificates
Quality Controlled PV by TÜV Rheinland; CE-compliant;
IEC 61215:2016; IEC 61730:2016; PV module classification: Class II; UL 61730
1
Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)
1 INTRODUCTION
2 PLANNING
2.1 TECHNICAL SPECIFICATIONS