8
9
INSTALLATION AND OPERATION MANUAL SOLAR MODULES GENERATION 4 (G4) – HANWHA Q CELLS GMBH – EN
INSTALLATION AND OPERATION MANUAL SOLAR MODULES GENERATION 4 (G4) – HANWHA Q CELLS GMBH – EN
2 PLANNING
2.3 Mounting options
Specifications
MODULE TYPE
MOUNTING
OPTION
CLAMPING AREA
1
[MM]
ALLOWED STATIC
LOAD² [PA]
TEST-LOAD ACC. IEC
61215 PUSH/PULL [PA]
Q.PRO-G4.X
Q.PRO EC-G4.X
Q.PRO BFR-G4.X
Q.PLUS BFR-G4.X
CL1
Push
250 - 350
2700
5400/4000
>350 - 450
1900
Pull
250 - 450
2400
CL1 extended
(min. 20 mm)
Push
250 - 350
3600
>350 - 450
3300
Pull
250 - 450
2400
CL3
Push
250 - 450
3300
5400/4000
Pull
250 - 450
2400
CL4
Push
0 - 300
1350
2400/2400
Pull
0 - 300
1200
FB1
Push
345
2200
5400/4000
Pull
345
2800
FB2
Push
345
3200
5400/4000
Pull
345
2800
FB1
(250 mm)
Push
250
2900
5400/4000
Pull
250
2800
FB2
(250 mm)
Push
250
3200
5400/4000
Pull
250
2800
IP1
Push
-
3200
5400/4000
Pull
-
3000
IP2
Push
-
1350
2400/2400
Pull
-
1200
CL5 hybrid
clamping
Push
300 - 400
2700
2400/2400
Pull
300 - 400
2700
CL2 without
substructure
support
Push
0 - 100
1200
2400/2400
Pull
0 - 100
1100
1
Distance between outer edge of module and middle of the clamp.
² Describes the maximum module surface load (vertical to the module surface) regarding safety factors (e.g. EUROCODE). For
this purpose, the load value determined by load tests according to various criteria: laminate overlay, plastic deformation, module
failure, and were divided with a safety factor. The minimum calculated load value corresponds to the maximum permitted load.
2 PLANNING
2.3 Mounting options
MOUNTING OPTION CL1
Ä
Ensure, that the subconstruction does not run below the junction box.
Ä
Ensure, that the connection cables of the junction box don‘t run between laminate and substructure.
MOUNTING OPTION CL1 EXTENDED
Ä
Ensure, that there’s a distance of minimum 45 mm between laminate backside and subconstruction respectively
that the distance between module frame backside and substructure is minimum 20 mm.
Ä
Ensure, that the connection cables of the junction box don‘t run between laminate and substructure.
MOUNTING OPTION CL4
Ä
Ensure, that the subconstruction runs exactly below the frame, not below the laminate (module less frame).
MOUNTING OPTIONS FB1 AND FB2
Ä
Ensure, that the connection cables of the junction box don‘t run between laminate and substructure.
•
Use M8 corrosion-proof screws and washers (diameter 16 mm).